US 41 (Tamiami Trail) Repaving from 15th Ave to Bullfrog Creek 441387-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Completed |
| Limits | from 15th Ave to Bullfrog Creek |
| Project Start | November 25, 2021 |
| Length | 8.5 miles |
| City | Apollo Beach Ruskin |
| County | Hillsborough |
| Road | Tamiami Trail US 41 |
| Construction Cost | $25.6 million |
| Estimated Completion | Fall 2024 |
| Contractor | Preferred Materials, Inc. |
About
All construction activities associated with this project were completed during February 2025.
The Florida Department of Transportation replaced the asphalt pavement with a durable concrete surface at US 41 (Tamiami Trail) and Big Bend Road (CR 672) in Hillsborough County.
In addition to the intersection improvements, this project repaved approximately 8.5 miles of roadway between 15th Avenue and Bullfrog Creek, added a sidewalk along the west side of US 41, and connected existing sidewalks on the east side of US 41 from bus stops to nearby intersections.