← 1208.pdf_v_d10192026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 19 (Commercial Way) Sidewalk Improvements from Applegate Drive to Trenton Avenue
450971-1-52-01
| Project Details | |
| Work Type | Sidewalk Improvements |
|---|---|
| Phase | Construction |
| Limits | US 19 Sidewalk Improvements from Applegate Drive to Trenton Avenue |
| Project Start | Late 2026 |
| Length | 0.97 miles |
| City | Spring Hill |
| County | Hernando |
| Road | Commercial Way US 19 |
| Estimated Completion | Summer 2027 |
| Contractor | Leon America Construction |
About
The purpose of this project is to construct a 5-foot concrete sidewalk along the south side of US 19 (Commercial Way) between Applegate Drive and Trenton Avenue.
Construction is anticipated to begin late 2026.
Contact Information
Project Information
John McShaffrey 813-975-6930 john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 450971-1-52-01)
Last Updated: 10/19/2026