← 1012.pdf_v_d09212026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
US 98/SR 50 at Mondon Hill Road / Spring Lake Highway 447237-1-52-01
| Project Details | |
| Work Type | Resurfacing - Rigid Pavement Reconstruction |
|---|---|
| Phase | Construction |
| Limits | US 98/SR 50 at London Hill Road / Spring Lake Hwy |
| Project Start | May 18, 2026 |
| Length | 0.285 Miles |
| City | Brooksville |
| County | Hernando |
| Road | SR 50 US 98 |
| Construction Cost | $9.5 million |
| Estimated Completion | spring 2027 |
| Contractor | Watson Civil Construction, Inc. |
About
This project includes rigid pavement reconstruction of the US 98 / SR 50 intersection at Mondon Hill Road / Spring Lake Highway in the Brooksville area of Hernando County. The intersection will be reconstructed from asphalt to concrete pavement.
Additional improvements include asphalt resurfacing of the pavement approaches to the concrete area of the intersection, safety modifications, providing ADA compliant curb ramps, driveway reconstruction, minor drainage modifications, minor signalization work, signing and pavement markings, and lighting improvements.
Contact Information
Project Information
John McShaffrey 813-975-6930
john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 447237-1-52-01) Last Updated: 09/21/2026