← 1176.pdf_v_d12292025.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
S.R. 686 (Roosevelt Boulevard) Pavement Reconstruction at 28th Street 447236-1-52-01
| Project Details | |
| Work Type | Pavement Reconstruction |
|---|---|
| Phase | Design |
| Limits | S.R. 686 (Roosevelt Boulevard) from west of 28th Street to east of 28th Street |
| Length | 0.3 miles |
| City | St. Petersburg |
| County | Pinellas |
| Road | SR 686 |
| Contact Information | |
| Design Manager | |
| Dinyar Sharifabad (813) 975-6172 | Dinyar.Sharifabad@dot.state.fl.us |
|---|---|
| Media Contact | |
| Kayla Mejia | 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us | |
About
This project will mill the existing asphalt pavement and resurface with concrete pavement along State Road (S.R.) 686 from west of 28th Street to east of 28th Street in St. Petersburg.
Construction is anticipated to begin June 2028.