← 1176.pdf_v_d12292025.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
S.R. 686 (Roosevelt Boulevard) Pavement Reconstruction at 28th Street 447236-1-52-01
Project Details
Work TypePavement Reconstruction
PhaseDesign
LimitsS.R. 686 (Roosevelt Boulevard) from west of 28th Street to east of 28th Street
Length0.3 miles
CitySt. Petersburg
CountyPinellas
RoadSR 686
Contact Information
Design Manager
Dinyar Sharifabad (813) 975-6172Dinyar.Sharifabad@dot.state.fl.us
Media Contact
Kayla Mejia813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will mill the existing asphalt pavement and resurface with concrete pavement along State Road (S.R.) 686 from west of 28th Street to east of 28th Street in St. Petersburg.
Construction is anticipated to begin June 2028.