← 1090.pdf_v_d08312026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
US 301 at Wire Road -- New Traffic Signal 455145-1-52-01
Project Details
Work TypeTraffic Signal Installation and Intersection Improvement
PhaseConstruction
LimitsIntersection of US 301 at Wire Road
Project StartMay 11, 2026
Length1,200 feet (0.23 mile)
CityZephyrhills
CountyPasco
RoadUS 301
Construction Cost$1.7 million
Estimated Completionlate 2026 / early 2027
ContractorCone & Graham, Inc.
About
This project will install a new traffic signal at the US 301 / Wire Road intersection. The project will also include the construction of a new northbound left turn lane due to the high volume of U-turns. Pedestrian crosswalks and roadway lighting will also be built as part of this project.
Construction began May 11, 2026.
Contact Information
Project Information
John McShaffrey 813-975-6930 john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 455145-1-52-01) Last Updated: 08/31/2026