Tampa Bay Florida Department of Transportation
SR 676 (Causeway Boulevard) Repaving from US 301 to US 41 (50th Street) 446272-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom US 301 to US 41 (50th Street)
Project StartJuly 15, 2025
Length3.072 Miles
CityTampa
CountyHillsborough
RoadCauseway Boulevard (Hillsborough) SR 676
Construction Cost$5.3 million
Estimated CompletionSpring 2026
ContractorPreferred Materials, Inc.
About
All construction activities associated with this project were completed on Friday, March 18, 2026.
This project repaved SR 676 (Causeway Boulevard) from US 301 to US 41 (50th Street) in Hillsborough County.
In addition, pedestrian curb ramps and push-button crosswalks were updated to comply with ADA requirements at Maydell Drive and updated the traffic signal detection at Maydell Drive and 78th Street.