← 103.pdf_v_d02112020.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
CR 490A (Halls River Road) Bridge Replacement at Homosassa Springs 430021-1-52-01
Project Details
Work TypeBridge Replacement
PhaseCompleted
Limitsfrom west of Halls River to east of Halls River
Project StartJanuary 2017
Length.33 miles
CityHomosassa
CountyCitrus
RoadHalls River Road
Construction Cost$7.6 million
Estimated CompletionFall 2019
ContractorWatson Civil Construction, Inc.
Contact Information
Project Information
Zachary Stringer 352-848-2651
Zachary.Stringer@dot.state.fl.us
Media Contact
David Botello 813-975-6060
David.Botello@dot.state.fl.us
About
FINAL ACCEPTED ON JANUARY 21, 2020
The new 57-foot wide bridge will be made of state of the art rust-resistant materials and built in the same location as the previous 30-foot wide bridge. It will feature a 12-foot travel lane in each direction, eight-foot shoulders, and five-foot sidewalks.
Traffic is now using half of the new bridge and shoulder in a temporary two-way configuration while the second half of the new bridge is built.
Motorists are advised to use caution while traveling through the work zone. Access to driveways and side streets are being maintained.
The $7.6 million project is expected to finish in the fall of 2019.