← 1024.pdf_v_d04092026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 574 (Dr Martin Luther King Jr Boulevard) Repaving from Gallagher Road to Oakbrook Lane 437560-1-52-01
| Project Details | |
| Work Type | Repaving |
|---|---|
| Phase | Design |
| Limits | from Gallagher Road to Oakbrook Lane |
| Length | 4.304 Miles |
| City | Dover |
| County | Hillsborough |
| Road | MLK Blvd SR 574 |
Contact Information
Design Manager
Charlie Xie
813-975-6287
Charlie.Xie@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will repave SR 574 (Dr. Martin Luther King Jr. Boulevard) from Gallagher Road to Oakbrook Lane in Hillsborough County.
The project is currently in the design phase.
Construction is anticipated to begin Spring 2027.