← 945.pdf_v_d06222026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
US 19/US 98 (N Suncoast Boulevard) Repaving from south of NE 1st Terrace to south of Snug Harbor Road 437515-1-52-01
Project Details
Work TypeRepaving
PhaseConstruction
Limitssouth of NE 1stTerrace to southof Snug HarborRoad
Project StartJune 22, 2026
Length1.2 miles
CityCrystal River
CountyCitrus
RoadSuncoastBoulevardUS 19US 98
ConstructionCost$4.5 million
EstimatedCompletionearly 2027
ContractorSuperiorAsphalt, Inc.
Contact Information
Project Information
John McShaffrey (813) 975-6930 john.mcshaffrey@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060 Kayla.Mejia@dot.state.fl.us
About
This project will repave US 19 / US 98 (Suncoast Boulevard) from south of NE 1st Terrace to the south of NW Snug Harbor Road in Crystal River.
Other project improvements included sidewalk reconstruction, drainage, raised mid-block pedestrian crossings, signing and pavement markings, signalization, and lighting.
Construction is underway as of June 22, 2026.
PUBLIC MEETING
An in-person public meeting was held on August 27, 2024 and a virtual public meeting was held on August 28, 2024 to allow attendees to review proposed median modification displays and have the opportunity to submit comments and speak with the project team.
For more information on this project, or to sign-up to receive construction updates and traffic alerts, please visit FDOTtampabay.com (Project Number: 437515-1-52-01) Last Updated: 06/22/2026