Tampa Bay Florida Department of Transportation
SR 580 (Busch Boulevard) Corridor Improvements from N Dale Mabry Highway to Nebraska Avenue 435908-2-52-01 & 435908-2-52-02
Project Details
Work TypeUrban Corridor and Safety Improvements
PhaseConstruction
LimitsSR 580 (Busch Boulevard) from N Dale Mabry Highway to Nebraska Avenue
Project StartEarly 2027
Length3.7 miles
CityTampa
CountyHillsborough
RoadBusch Boulevard SR 580
Construction Cost$12.8 million
Estimated CompletionLate 2027
ContractorC.W. Roberts Contracting, Inc.
Contact Information
Project Information
Maricelle Venegas 813-975-6204
Maricelle.Venegas@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will improve the urban corridor on SR 580 (Busch Blvd) from N Dale Mabry Hwy to Nebraska Avenue in Tampa, Hillsborough County.
Key improvements within the project limits include:
Milling and resurfacing the roadway pavement
Narrowing the travel lanes to 10 feet
Reducing the posted speed limit to 35 mph
Improving the sidewalk connectivity on the south side of Busch Blvd (where possible)
Adding and reconstructing the medians along the corridor
Enhancing the pedestrian safety improvements at intersections
Upgrading the corridor lighting, pavement markings, and signage
Installing a new traffic signal at Rome Circle and reconstructing two traffic signals at Florida Avenue and Nebraska Avenue
Placing the Rectangular Rapid Flashing Beacons (RRFBs) to connect to Hillsborough Area Regional Transit Authority (HART) bus stops on the north and south sides of Busch Boulevard near Oakleaf Avenue.
Construction is anticipated to begin in early 2026.