← 785.pdf_v_d08132026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
Alt US 19 (Myrtle Avenue) Railroad Crossing Replacement between Hart Street and Maple Street 437553-1-52-01
| Project Details | |
| Work Type | Rail Road Crossing Replacement |
|---|---|
| Phase | Design |
| Limits | Alt US 19 (Myrtle Avenue) between Hart Street and Maple Street |
| Length | 0.03 mile |
| City | Clearwater |
| County | Pinellas |
| Road | Alt US 19 Myrtle Avenue |
Contact Information
Design Manager
Anh-Thu Nguyen, PE
813-975-6197
Anh-Thu.Nguyen@dot.state.fl.us
Media Contact
Kayla Mejia
813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This project will replace the existing railroad crossing along this section of Alt US 19 (N Myrtle Avenue). Damaged sidewalks will also be replaced, and detectable warning surfaces will be added on all sidewalks approaching the railroad crossing.
Construction is anticipated to begin in 2027.