← 1220.pdf_v_d06112026.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON

Tampa Bay Florida Department of Transportation
SR 694 (Park Boulevard) New Traffic Signal at 60th Street in Pinellas County 454839-1-54-01
Project Details
Work TypeNew Traffic Signal
PhaseConstruction
Limitsat 60th Street
Project StartJune 1, 2026
CityPinellas Park
CountyPinellas
RoadSR 694
Construction Cost$2.3 million
Estimated CompletionSummer 2027
ContractorCone & Graham, Inc.
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us
About
This construction project is addressing safety improvements with the construction of a new traffic signal on SR 694 (Park Boulevard) at 60th Street in Pinellas County.
The mid-block pedestrian crossing just east of 60th Street will be removed.
Elements of work shall include, but are not limited to, installation of a new signalized intersection, roadway resurfacing, and sidewalk, pedestrian and lighting improvements.
Construction activities are underway and expected to be complete in summer 2027.