← 1040.pdf_v_d07162026.pdf
Rebuilt HTML โ PaddleOCR-VL (Baidu)
Content placed at each item's bbox to mirror the original PDF layout (font sizes are estimated). overlay ยท view JSON
Page 1
Download HTML
Tampa Bay
Florida Department of Transportation
SR 686 (East Bay Drive) Repaving from west of Belcher Road to east of US 19 447917-1-52-01
| Project Details | |
| Work Type | Repaving, sidewalk, signing, pavement markings, signalization and lighting |
|---|---|
| Phase | Completed |
| Limits | from west of Belcher Road to east of US 19 |
| Project Start | August 23, 2025 |
| Length | 1.2 Miles |
| City | Largo |
| County | Pinellas |
| Road | East Bay Drive Roosevelt Boulevard SR 686 |
| Construction Cost | $7.9M |
| Estimated Completion | Fall 2026 |
| Contractor | Hubbard Construction |
About
As of July 1, 2026, all construction activities associated with this project have been completed.
This project will repave a 1.2-mile stretch of SR 686 (Roosevelt Boulevard/East Bay Drive) from west of Belcher Road to the east of US 19 in Pinellas County.
In addition, new bicycle lanes, ADA improvements, upgraded LED lighting, signage, pavement markings, and signalization upgrades will also be included.
Construction activities are anticipated to complete in fall 2026.
Contact Information
Project Information
Maddie Griffin 727-575-8334
Maddie.Griffin@dot.state.fl.us
Media Contact
Kayla Mejia 813-975-6060
Kayla.Mejia@dot.state.fl.us