Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
COMMERCIAL USE ONLY โ INITIAL EVERY ITEM ON SHEET โ DATE STAMP
COMPLETE ALL ITEMS:
PERMIT NUMBER: ___ BLOCK: ___ LOT: ___ ADDRESS: ___
BUSINESS NAME: ___ CONSTRUCTION COST: ___ REGISTRATION NUMBER: ___
C.O. APPLICATION NAME/RESPONSIBLE PERSON IN CHARGE: ___
ADDRESS: PHONE NUMBER: (W) ___ (C) ___
USE GROUP: ___ LIVE LOAD: ___ OCCUPANCY LOAD: ___ CONSTRUCTION CLASS: ___
COST OF CONSTRUCTION: ___ REGISTRATION CERTIFICATE: ___
CERTIFICATE FEE : _____[10% OF ALL PERMITS, LESS DCA FEES] FIRE DISTRICT: _____
REQUIRED PRIOR AND FINAL APPROVALS [WHERE APPLICABLE] PRIOR FINAL
- LETTER FROM THE PROPERTY OWNER APPROVING OCCUPANCY: ___ ___
- ZONING APPOVAL ___
- M.U.A. LETTER [WATER & SEWER] ___
- O.C. BOARD OF HEALTH [WELL WATER & SEPTIC CERTIFICATE OF COMPLIANCE ___
- O.C. BOARD OF HEALTH RETAIL FOOD HANDLERS LICENSE & COPY OF SATISFACTORY CERTIFICATE
- MUNICIPAL FOOD HANDLING LICENSE โ ISSUED BY THE TOWNSHIP CLERK
- STATE HEALTH DEPARTMENT WHOLESALE FOOD HANDLERS LICENSE
- OPEN PERMITS [___]
_____ _____
- OPEN VIOLATIONS [_____]
_____ _____
- D.E.P. [IF REQUIRED]
___ ___
FINAL INSPECTION DATES: [ALL INSPECTIONS]
- FINAL INSPECTION DATES: [ALL INSPECTIONS] BUILDING ___ ELECTRIC ___ FIRE ___ PLUMBING ___
- TREE REMOVAL RELEASE DATE โ ZONING / FINAL TREE REMOVAL DATE โ ENGINEERING ___
- PINELANDS APPROVAL ___
- DUMP RECEIPTS
- ENGINEERING
___
PRELIMINARY ENGINEERING: ___ AS-BUILT: ___ FINAL ENGINEERING: ___ BOND: ___
- OCEAN COUNTY SOILS PRELIMINARY ___________ CONDITIONAL EXP. DATE
- DEVELOPMENT FEES PRELIMINARY __________ FINAL __________ COAH ROUND 3 __________ CERTIFICATES โ IF REQUIRED FIRE ALARM _____
- โข DEVELOPMENT FEES
PRELIMINARY ___ FINAL ___ COAH ROUND 3 ___
CERTIFICATES โ IF REQUIRED
FIRE ALARM ___ HAZAQRDOUS MATERIALS LIST ___ D.E.P. AIR QUALITY ___
ELEVATOR ___ KITCHEN HOOD & SUPPRESSION SYSTEM ___ FIRE SPRINKLER ___
EMERGENCY GENERATOR ___ BACKFLOW PREVENTOR PLUMBING/FIRE ___ PEST CONTROL ___
โ โ โ โ
APPROVED ___ TCO/NUMBER OF DAYS ___ DENIED ___
PENDING: ___
___
REJECTED: ___ REASON: ___