NOTICE OF MEETING DUBUQUE COUNTY BOARD OF SUPERVISORS
Date: Monday, October 26, 2026 Time: 1:00 PM Place: Board Chambers, 4th Floor Courthouse
Or Join Zoom Meeting
https://us06web.zoom.us/j/84624242719?pwd=Yf9sszDgXufijQrsafTFRte6Jdf8A0.1
Meeting ID: 846 2424 2719 Passcode: 306974
AGENDA Board members reserve the right to move items from the order listed on the agenda.
1. PUBLIC COMMENTS - AGENDA ITEMS
Data Center Work Session
Dubuque County Data Center Planning Process
Data Center Framework/Roadmap
Discussion with Deputy Sheriff Joe Kennedy on possible traffic and construction issues
Discussion with Emergency Management Services Director Tom Berger on EMS Services
Gap analysis - surface & groundwater testing and monitoring
Upcoming Meeting Dates
In compliance with Iowa Code Section 21.4, Board of Supervisors meeting agendas are posted on the bulletin board outside the Board Chambers and the County website a minimum of 24 hours prior to the scheduled meeting. After such time, the posted agenda will not change; however, agenda packet attachments may be modified or added until the start of the meeting.
If you require the assistance of auxiliary aids or services to participate in this meeting because of a disability, immediately call
the County Auditor's Office at 563-589-4499 or the County Personnel Office at 563-589-4445. If you are hearing impaired, call Relay Iowa TTY at 1-800-735-2942.
Dubuque County Board of Supervisors
Wayne Kenniker Wayne.Kenniker@dubuquecountyiowa.gov
Ann McDonough Ann.Mcdonough@dubuquecountyiowa.gov
Harley Pothoff Harley.Pothoff@dubuquecountyiowa.gov
DUBUQUE COUNTY DATA CENTER PLANNING PROCESS
Initially presented and discussed at Board of Supervisors meeting, June 15, 2026, and updated and approved by the Board, July 6, 2026.
Scope of Moratorium
This moratorium and its resulting recommendations shall apply only to proposed large-scale industrial and/or hyperscale data center developments within the unincorporated areas of the County, including associated or supporting infrastructure. Covered projects include developments requiring significant land use, major electrical infrastructure, substantial water consumption, utility expansion, or campus-style construction.
SECTION 1 β€” REQUIRED COMMITMENTS AND DELIVERABLES DURING THE MORATORIUM
During the one-year moratorium period, the Board of Supervisors, with support from County staff, shall complete the following actions prior to consideration of any data center application, rezoning request, permit approval, or related infrastructure approval. Responsibility for each action shall be assigned to the appropriate County department or staff member.
A. Data Center Ordinance Development
The County shall draft and publicly review a comprehensive Data Center Ordinance addressing but not limited to:
Land use and zoning standards
Agricultural land preservation
Water usage and resource protection
Utility and power infrastructure impacts
Noise and lighting standards
Emergency response and fire suppression requirements
Environmental protections including air quality, waste discharge, and stormwater management
Road use and infrastructure impacts
Dubuque County Data Center Planning Process July 6, 2026
Page 2 of 5
Setbacks, buffering, and screening requirements
Decommissioning and bonding requirements
Submission requirements, technical studies, timelines, interdepartmental review, public notice, impact fees, development agreements, financial assurances, monitoring, enforcement, and reporting
Vibration standards, Radio frequency & electro-mechanical standards, Health Concerns, Compliance and penalty enforcement, Construction Period Restrictions, Transparency, Economic development agreement, Costs and Payment assignments
B. Required Assessments and Reviews
The County shall complete the following and other evaluations with appropriate expert and staff review:
Infrastructure and road impact assessments
Water usage and resource assessments
Emergency services capability reviews
Environmental and land use compatibility reviews
Utility and electrical grid impact reviews
Neighboring property impact assessments
Health Impacts and Standards
Vibration standards, Radio frequency & electro-mechanical standards, Health Concerns, Compliance and penalty enforcement, Construction Period Restrictions, Transparency, Economic development agreement, Costs and Payment assignments
C. Public Engagement Requirements
The County shall conduct:
A minimum of four public town hall meetings by October 31, 2026
Weekly public ordinance review sessions involving Supervisors and staff beginning the week of June 22, 2026
A final public hearing prior to ordinance consideration
The County will maintain a dedicated webpage on the County's website to provide a centralized source of information throughout the moratorium, including schedules, agendas, minutes, draft ordinances, related studies and reports, public comments, timelines, frequently asked questions, and other documents related to the process.
Dubuque County Data Center Planning Process July 6, 2026
Page 3 of 5
All meetings shall be publicly noticed, recorded, and archived.
D. Timeline and Deliverables
TimelineDeliverable
Within 60 DaysCompletion of ordinance gap analysis
Within 120 DaysRelease of initial public ordinance draft
Within 180 DaysCompletion of public hearings and updated ordinance draft
Within 300 DaysRelease of final ordinance draft
Prior to ExpirationFormal public hearing and Board consideration
E. Moratorium Restrictions
During the moratorium, neither Dubuque County nor any County department, board, commission, official, employee, or agent shall accept, process, review, approve, issue, or otherwise authorize any discretionary approval for a covered Data Center project or supporting infrastructure.
SECTION 2 β€” EXECUTION STRUCTURE AND PROCESS
A. Weekly Supervisor Work Sessions
The Board of Supervisors shall hold weekly public work sessions throughout the moratorium focused on, but not limited to:
Ordinance development
Staff progress updates
Review of studies and reports
Assignment of responsibilities and deadlines
Public questions and feedback, as appropriate
Each meeting shall:
Be publicly noticed
Include agendas and meeting summaries
Dubuque County Data Center Planning Process July 6, 2026
Page 4 of 5
Be recorded and publicly accessible
B. Monthly Progress Reporting
County staff and/or designated committees shall provide monthly public progress reports identifying:
Completed deliverables
Outstanding tasks
Delays or deficiencies
Upcoming milestones and deadlines
C. Public Drafting and Review Process
The ordinance development process shall remain open and transparent through:
Public access to draft ordinance language
Public review opportunities
Open discussion of revisions and recommendations
D. Accountability and Tracking
At the conclusion of each meeting:
Action items shall be assigned
Deadlines shall be established
Progress shall be publicly tracked
A final public findings report will be produced by County staff summarizing the planning process, technical analyses, public input received, recommendations considered, and the rationale supporting the adopted ordinance and any related policy decisions.
The moratorium process shall remain focused on ordinance development, completion of required studies, public engagement, and establishment of enforceable protections prior to consideration of any data center proposal.
SECTION 3 β€” CONDITIONS FOR TERMINATION OF THE MORATORIUM
The Board may consider the termination of the moratorium in accordance with the Moratorium Resolution adopted by the Board on July 6, 2026.
Extension Provision
The Board may extend the moratorium in accordance with its moratorium resolution.
Dubuque County Data Center Planning Process July 6, 2026
Page 5 of 5
Adopted by the Dubuque County Board of Supervisors this 6th day of July, 2026.
Harley V. Pothoff Harley V. Pothoff (Jul 7, 2026 16:51:23 CDT)
Harley V. Pothoff, Chair Dubuque County Board of Supervisors
ATTEST:
Keith Lucy (Jul 7, 2026 15:17:37 CDT)
Keith Lucy, Dubuque County Auditor
PLANNING PROCESS REVISION LOG
RevDescriptionBOS Approval
#1BOS Data Center will be weekly in weeks the Board has no regular meeting
2Conservation will be a required assessment in Sec. B
PHASE 9 – ORDINANCE FRAMEWORK
PHASE 9 - ORDINANCE FRAMEWORK
☐ 1. PURPOSE☐ 2. DEFINITIONS☐ 3. APPLICABILITY☐ 4. ZONING☐ 5. SITING STANDARDS☐ 6. ENVIRONMENTAL STANDARDS
☐ Clearly define why the ordinance exists. ☐ Protect health, safety, welfare, land, and future generations.☐ Avoid ambiguity. Examples: ☐ Data Center ☐ Hyperscale ☐ Campus ☐ Expansion ☐ Backup Generator ☐ Cooling Facility ☐ Battery Storage ☐ Utility Infrastructure ☐ Sensitive Receptor ☐ Prime Farmland ☐ Critical Habitat☐ When permit required ☐ Campus expansions ☐ Utility upgrades ☐ Accessory uses ☐ Temporary facilities☐ Conditional Use only. ☐ Never permitted by right.☐ Minimum acreage ☐ Maximum footprint ☐ Maximum impervious coverage ☐ Building height ☐ Setbacks ☐ Buffers ☐ Road frontage ☐ Visual screening ☐ Landscaping ☐ Agricultural compatibility☐ Noise ☐ Lighting ☐ Heat ☐ Air emissions ☐ Stormwater ☐ Water conservation ☐ Wetlands ☐ Groundwater ☐ Tree preservation ☐ Dust
☐ 7. INFRASTRUCTURE☐ 8. OPERATIONAL STANDARDS☐ 9. PERFORMANCE STANDARDS☐ 10. MONITORING☐ 11. FINANCIAL ASSURANCE☐ 12. ENFORCEMENT
☐ Road improvements ☐ Bridge improvements ☐ Traffic control ☐ Utility upgrades ☐ Fiber ☐ Power ☐ Water ☐ Wastewater☐ Emergency plans ☐ Hazardous materials ☐ Generator testing ☐ Battery storage ☐ Maintenance ☐ Snow removal ☐ Security☐ Maximum decibel levels ☐ Maximum light spill ☐ Maximum water consumption ☐ Maximum emissions ☐ Maximum vibration ☐ Annual reporting☐ Annual inspections ☐ Independent audits ☐ Water monitoring ☐ Noise testing ☐ Lighting verification ☐ Air monitoring☐ Road bond ☐ Stormwater bond ☐ Landscaping bond ☐ Decommissioning bond ☐ Utility restoration bond ☐ Environmental cleanup bond☐ Inspections ☐ Violations ☐ Civil penalties ☐ Permit suspension ☐ Permit revocation ☐ Injunction authority
☐ 13. DECOMMISSIONING
☐ Timeline☐ Equipment removal☐ Foundation removal☐ Utility removal☐ Soil restoration☐ Agricultural restoration ☐ Bond release only after completion
This structure ensures the ordinance is clear, enforceable, and aligned with county goals, while providing strong public involvement and accountability.
DUBUQUE COUNTY
DATA CENTER ORDINANCE DEVELOPMENT ROADMAP
A CLEAR PROCESS. PROTECTING LAND. SERVING PEOPLE. PLANNING FOR THE FUTURE.
ESTABLISH THE FOUNDATION
PUBLIC VISIONING
COMPREHENSIVE PLAN CONSISTENCY
FACT FINDING
Adopt guiding principles that drive every decision and ordinance provision.
Conduct independent technical assessments (not developer-provided).
Engage the public early and meaningfully.
Ensure all policies align with the Comprehensive Plan.
Verify compatibility with future land use, agricultural, conservation, and infrastructure goals.
Use β€œconditions” approach.
Define County priorities.
Land, utilities, environment, infrastructure, community, and economic analysis.
Hold workshops and stakeholder meetings.
Affirm commitment to public health & safety, land preservation, and fiscal responsibility.
Do not rely on developer-provided data. and priorities.
No ordinance language should contradict the Plan
Document community values and priorities.
Ensure transparent public process.
Map exclusion areas: prime farmland, floodplains, wetlands, karst, parks, schools, scenic corridors, historic resources, etc.
Identify only limited Opportunity Areas.
INFRASTRUCTURE CAPACITY STUDY
FISCAL IMPACT ANALYSIS
Require applicant-funded, independent studies.
Conduct independent fiscal impact review.
Evaluate electrical, water, wastewater, roads, bridges, fiber, emergency services, and more.
Evaluate revenues, expenses, services, infrastructure, long-term maintenance, and opportunity costs.
No approval until deficiencies are identified and funded. Net fiscal benefit must be demonstrated over 30 years.
RISK ASSESSMENT
Assess environmental, economic, and community risks.
Identify and evaluate potential short- and long-term impacts.
Plan for mitigation and contingencies.
ORDINANCE FRAMEWORK
PUBLIC REVIEW & ADOPTION
Draft ordinance with clear standards and requirements.
Publish draft for public review (minimum 30 days).
Include zoning, siting, environmental, operational, performance, monitoring, financial assurance, enforcement, and decommissioning.
Planning & Zoning, Township, Utility, and Legal review.
Public hearing(s).
Revise as needed.
POST-ADOPTION IMPLEMENTATION & OVERSIGHT
Require annual reporting from data center operators.
Monitor compliance through inspections and audits.
Report publicly on performance and impacts.
Review ordinance annually and update as needed.
ANNUAL REPORTS SHOULD INCLUDE:
Water use β€’ Tax revenue
Electrical consumption β€’ Environmental monitoring
Jobs and payroll
Noise and light complaints Emergency responses
Emergency responses
Compliance history
Decommissioning fund status
ORDINANCE KEY COMPONENTS (INCLUDED IN PHASE 9)
SITING STANDARDS
INFRASTRUCTURE REQUIREMENTS
OPERATIONAL STANDARDS
PERFORMANCE STANDARDS
PUBLIC HEALTH & SAFETY
FINANCIAL ASSURANCE
ENFORCEMENT
Setbacks & buffers β€’ Noise β€’ Road improvements
Emergency plans
Max decibel levels
Protect public health
Max decibel levels Max light spill
Protect public health
Road bond
Annual inspections | Inspections
Define data center.
Minimum acreage β€’ Lighting
Bridge improvements | Hazardous materials
Max light spill
Emergency response
Stormwater bond
Violations
Emergency response coordination
Independent audits
campus, expansion.
Max footprint Heat
Traffic control
Generator testing
Max water use coordinationβ€’ Landscaping bondβ€’ Water monitoring
Landscaping bond
Civil penalties
and accessory uses
Air emissions
Utility upgrades β€’ Battery storage
Max emissions
Fire safety
Decommissioning
Noise testing
Fire safety
Maintenance
Chemical & fuel storage safety
Specify when permits
Fiber
Maintenance
Max vibration storage safety bond β€’ Lighting verification
Permit revocation
are required β€’ Setbacks & buffers
Building height limits
Water conservation
Utility restoration bond
Power
Snow removal
Annual reporting
Injunction authority
Air & water quality protection
Never permitted
Minimum acreage
Road frontage
Wetlands
Water
Security
Never p by right
by right β€’ Visual screening & β€’ Groundwater
Environmental
[F
[F23]
[F22]
[F2]
landscaping
Tree preservation
cleanup bond
[F3] 2 [F4]
[F25] [F7] [F22]
Dust
DECOMMISSIONING
Foundation Utility
Equipment
Foundation Removal
Soil
Removal Removal Removal Restoration
Removal
Agricultural
Agricultural
Restoration
Bond release only after completion
CROSS-CUTTING PRINCIPLES
AVOIDANCE – Can impacts be avoided?
MINIMIZATION – Can remaining impacts be reduced?
MITIGATION – Can unavoidable impacts be offset?
MONITORING – Will compliance be verified over time?
ENFORCEMENT – Are meaningful remedies available?
DECISION GATE MATRIX (ALL GATES MUST BE PASSED)
1 Comprehensive Plan Consistent with adopted county plans.
2 Site Suitability Outside exclusion areas or meets strict exceptions.
3 Infrastructure Capacity exists or upgrades are fully funded by developers.
4 Environmental Protection Independent studies demonstrate compliance.
5 Fiscal Neutrality Public costs fully covered and long-term benefits demonstrated.
6 Community Compatibility Noise, lighting, traffic, visual impacts meet standards.
7 Financial Assurance Bonds and guarantees in place before construction.
8 Public Interest Board finds project advances public health, safety, and welfare.
10100000000
U
PROTECT LAND. PROTECT RESOURCES. PROTECT OUR FUTURE.
JOSEPH L. KENNEDY, Sheriff
DAVID T. RINIKER, Chief Deputy
OFFICE OF SHERIFF DUBUQUE LAW ENFORCEMENT CENTER 770 IOWA STREET – PO BOX 1004 – DUBUQUE, IOWA 52004-1004 PHONES: EMERGENCY 911 – ADMINISTRATION 563-589-4406 – FAX 563-589-7882
September 28, 2026
To: Dubuque County Board of Supervisors, Chairperson Harley Pothoff
From: Sheriff Joe Kennedy
Re: Datacenter safety concerns
Chairperson Pothoff,
During a Board of Supervisors meeting a few weeks ago, there was discussion and request for information regarding law enforcement-related issues that have occurred because of datacenters. Following that discussion, I reached out to several Sheriff's and Chiefs of Police in areas that either have completed datacenters within their service areas or have datacenters currently in the construction process, with the purpose of ascertaining the issues they have experienced regarding these structures.
The results showed outside of the increased traffic and construction-related complaints during the construction phase of these projects, these law enforcement professionals reported no other concerns with the presence of datacenters within the community. The only call for service they reported receiving to the datacenter site itself was an extra attention to the site due to a terminated construction employee. Feel free to reach out if you have any further questions.
Feel free to reach out if you have any further questions.
Respectfully submitted,
Joseph L. Kennedy, Sheriff
Dubuque County Sheriff's Office
14928 Public Safety Way Dubuque, IA 52002-8216 Phone: 563-589-4170 Fax: 563-589-0015 E-Mail: tom.berger@dbqcoema.com
Thomas I. Berger, Coordinator Mike Wuertzer, Chairperson Dan Neenan, Vice-Chairperson
Date: October 22, 2026
To: Dubuque County Board of Supervisors
From: Thomas I. Berger, Emergency Management Coordinator
RE: Data Center Ordinance Development
In your process of creating an ordinance for Data Centers, I would like you to consider the following as it relates to emergency management. The core focus of emergency management is related to planning, training, exercises, equipment and organization.
Things to consider are as follows:
Planning
Include the fire chief having jurisdiction of the project early in the process. They are the best person to know the response capabilities of their department as well as their mutual aid partners.
Tier 2 reporting of onsite hazardous materials to the local fire department and local emergency planning committee as required by state and federal law. This report identifies chemicals and hazards on site and is required annually for updated quantities.
Access locations should be readily marked and familiar with responding agencies.
An emergency response plan should be developed and shared with local fire, law enforcement, public health, emergency medical services and emergency management ensuring all agencies are on the same page for response. The plan shall include specific response actions needed to match the hazards in the facility (i.e. battery storage). The plan should also include severe weather sheltering and evacuation plans. Ingress and egress routes for emergency vehicles should be shared and identified in the plans.
Response plans shall be reviewed with company representatives and emergency response agencies at least annually.
Training
Training should be offered to the emergency responders as to the on-site hazards as well as any specific training needs due to the uniqueness of the operations. This could include
hazardous materials kept on site, response to battery fires/storage, and routine response for medical emergencies.
Training should be shared with emergency responders as to the safety aspects and equipment on site for use in an emergency.
Training should also be offered to any mutual aid fire department within Dubuque County as well as any adjacent county fire department or hazardous materials response team as determined by the fire chief that could reasonably respond to the facility.
Exercise
Annual walk-through familiarization with emergency responders to ensure prompt and appropriate emergency response.
Facilities should consider working with emergency management and hosting an exercise that would allow emergency responders to interact and respond with facility staff/safety teams to ensure an adequate and appropriate response to an emergency/mass casualty incident on site.
Equipment
- If specialized equipment is identified to respond to a data center emergency, the cost of the equipment and proper training should be funded by the owner of the facility.
Other information
Facility contact information should be up to date and shared with the emergency response partners as well as the Dubuque County 911 Center.
Any hazardous materials response to the facility should be reimbursed as required in the Dubuque County Hazardous Substance Ordinance.
I had the chance to meet with other county emergency management coordinators last week at our fall meeting of the Iowa Emergency Management Association. They indicated to me that once the data centers are constructed, there is not a lot of interaction between the data centers and the emergency management agency. There is probably more interaction with fire and EMS for response plans and site visits. In Dallas County, the company is working with the local fire department to obtain additional equipment for the department to increase the department's response capabilities.
The coordinators did recommend that an emergency response plan for a data center be completed and include the local response agencies in the planning process. This should be the case for a data center or any other type of industry/business that the local fire department may have in their jurisdiction which may present special occupancy, hazards or impacts to agencies responding to an incident.
DUBUQUE COUNTY ZONING
1225 Seippel Road, Dubuque, Iowa 52002
MEMORANDUM
TO: Dubuque County Board of Supervisors
οΌ₯οΌ€οΌ²
FROM: Ed Raber, Planning & Development Dir., Ed.Raber@dubuquecountyiowa.gov, 563-690-3035
DATE: October 22, 2026
RE: Data Center Gap Analysis – Surface & Groundwater Testing and Monitoring
As the County investigates the impacts of data centers, gaps are identified in our ability to measure or fully understand a particular metric or condition. The availability of groundwater is a metric that the County or State does not have available data on to provide an understanding for good decision making.
There is a considerable amount of ongoing surface water and well testing going on across Dubuque County, including some testing being conducted by Dubuque County. There is an opportunity to enhance the existing testing into more of a monitoring regimen and expand its gap areas of availability of groundwater, not just its condition.
Surface Water Testing
The Dubuque County Watershed Department has conducted routine monthly surface water testing at 58 sites across the County's HUC-12 sub-watersheds. A dashboard of testing results for all sites can be accessed through the website, www.dubuquecountywatersheds.org. The Watershed Department developed this dashboard in the summer of 2026, and is working to build on that to create additional ways for users to track individual testing sites and to see test results over time.
The hand-collected water samples are tested for the following metrics:
Conductivity
Total Dissolved Solids
Transparency (cm)
Chloride (mg/L)
Phosphate (mg/L)
pH (mg/L)
Nitrites (mg/L)
Nitrates (mg/L)
Dissolved Oxygen (mg/L)
Temperature (C)
E.Coli (CFU/100mL)
Data Center Gap Analysis – Surface & Groundwater Testing and Monitoring October 22, 2026
Page 2 of 3
Private Well Testing
The Dubuque County Public Health Department’s Environmental Health division conducts private well testing for private well owners at their request. Health Departments throughout the state conduct similar testing. Dubuque County Public Health Department applies annually for Private Well Grant funding through the state of Iowa. Testing is not done routinely but rather at the request of well owners. Test results funded through the grant are required to be entered into the Iowa Well Information System (IWIS), a public statewide database.
A private well is entirely managed by the well user, including the water supply well, the water distribution system, and all treatment systems. A private water supply connects to fewer than 15 individual connections (like homes, apartments, camp spaces, etc.) and provides water for less than 25 individuals per day. The County Public Health Department permits private well construction.
The County's grant-funded testing program may provide testing of private wells for the following:
E-coli/Coliform annually
Nitrate annually
Arsenic every three years
Manganese every three years
Lead if certain criteria are met
PFAS if certain criteria are met
Radon if certain criteria are met
In addition, the Public Health Department partners with the Iowa State Hygienic Laboratory to offer additional private well testing. The most commonly requested tests include:
β—‹ Nitrate ◐ Arsenic ◐ Manganese β—‹ Arsenic/Manganese Combined β—‹ Lead β—‹ Iron β—‹ Sulfate β—‹ Sulfide β—‹ Fluoride β—‹ Hardness
β—‹ Total Dissolved Solids
β—‹ Total Suspended Solids
Public Well Testing
Public water systems (PWS) are routinely monitored and tested by certified operators in compliance with Iowa DNR standards and the federal Safe Drinking Water Act rules. There are about 70 public wells in Dubuque County, including 10 owned by the Dubuque County Conservation Dept. The Conservation Dept. director and staff are certified to collect the well tests. Other public well systems include municipal wells, and rural operations where the well serves over 25 users per day, such as restaurants, etc. The public can access historical public well testing results statewide at the IWIS well search database.
These public well tests provide an insight into groundwater conditions. One of the things that makes Dubuque County and other northeast Iowa counties somewhat unusual is our karst soils which facilitate
Data Center Gap Analysis – Surface & Groundwater Testing and Monitoring October 22, 2026
Page 3 of 3
the transfer of surface waters to groundwater. There are multiple groundwater aquifers, some of which are confined and others that interact with surface water.
Routine public well testing includes monitoring for:
Nitrates
E-coli
Arsenic
Volatile/organic chemicals
Through collaborative work in the Zoning, Watershed, and Health Departments, we are preparing a presentation on historical public well test results for Dubuque County and statewide. This should be available in the next few weeks.
Groundwater Testing and Monitoring
The County has identified a gap in its understanding of groundwater availability, including its recharge rate, and any cyclical variation. This was pointed out by Iowa State Geologist, Keith Schilling during his presentation at NICC in August.
Our collaborative department efforts have been reviewing some options for how to develop an understanding of the groundwater status in Dubuque County. We have connected with Johnson County that has recently updated a USGS aquifer analysis and model. This was an expensive process and does not include ongoing monitoring, but does create a useful water model that can be a resource for municipal and public well owners.
We have also engaged with Linn County and a private Midwest company that provides non-intrusive technology to monitor water β€œheight” in existing wells. With the number of public wells, including the County Conservation wells and municipal wells, and others, this could create a geographically diverse way to monitor groundwater levels in real time, and with time, a historical trend or pattern.
As our investigations continue, we anticipate providing a report later this year, possibly with budget suggestions and possible opportunities for interjurisdictional collaboration.
This would go hand in hand with the well testing for contaminants, and the surface water testing already being conducted.
The goal of these monitoring and testing regiments would be to
develop an understanding of the overall health and availability of our water systems.
Create publicly available interfaces of data for both real time and historical trends and provide analysis of the system statuses.
Evaluate the effectiveness of other initiatives to reduce runoff and erosion, and improved farming practices such as cover crops and no till, to improve water quality in HUC-12 sub-watersheds throughout the County
Identify ways to focus resources on β€œhot spots” to mitigate issues identified in testing and monitoring.