← 445213-1_Project_Flyer_3-27-26_REM.pdf_sa_U_ved_2ahUKEwjE15HTtdGXAxXOnGoFHWVTAm8QFnoECAUQAQ_usg_AOvVaw0m4n-fCclUFBzOqgtZ816x_fexp_122108199,121877338,121877336,122108200.pdf

Rebuilt HTML โ€” PaddleOCR-VL (Baidu)

Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON

Financial Project Identification (FPID) No.: 445213-1

Eau Gallie Boulevard (S.R. 518) from Sarno Road to West of North Apollo Boulevard

Brevard County

PROJECT DESCRIPTION

The Florida Department of Transportation (FDOT) is improving safety and traffic operations along Eau Gallie Boulevard (State Road (S.R.)) from Sarno Road to west of North Apollo Boulevard in Brevard County. The project includes resurfacing the roadway to extend its service life.

CONTRACTOR Preferred Materials, Inc.

As part of these improvements, the roadway will be restriped to provide two 11-foot-wide travel lanes in each direction from Sarno Road to east of Croton Road, along with a 4-foot-wide paved shoulder on both sides to better accommodate bicyclists.

PROJECT COST $3.4 million

PROJECT START December 2025

Additional work includes upgraded signals, sidewalks, signs, and pavement markings.

WHAT TO EXPECT

ESTIMATED COMPLETION Spring 2026

During construction, motorists should expect intermittent single-lane closures during daytime and nighttime hours. The posted speed limit of 45 to 50 mph will remain in effect throughout the work zone.

Please be aware that construction activity and noise levels may vary throughout different phases of the project. Motorists should also anticipate areas of uneven pavement within the project limits, which is a common condition during construction when the contractor applies multiple asphalt layers in phases. Many of these roadway conditions are temporary and will gradually improve as the project progresses.

FOR QUESTIONS, CONCERNS, OR PROJECT UPDATES Send a request to:

Electronic message boards and additional signage will help direct traffic through the work zone. Please note that the construction schedule may change due to inclement weather or other unexpected conditions. For the most current project details and lane closure information, please visit FDOT's Central Florida website at www.cflroads.com. CONTRACTOR Preferred Materials, Inc.

Ashley Ingham Community Outreach Specialist 321-634-6111 Ashley.Ingham@dot.state.fl.us

For more information, scan the QR code above or visit the project website at www.cflroads.com/project/ 445213-1

Follow us on social media