Rebuilt HTML โ PaddleOCR-VL (Baidu)
Semantic HTML reconstructed from the OCR item tree (headings, text, lists, tables, form fields). overlay ยท view JSON
Orange Blossom Trail (U.S. 17-92/U.S. 441) Resurfacing Orange County Financial Project Identification (FPID) No.: 452882-1
Project Description
- Resurfacing all travel lanes to extend the service life of the roadway.
- Extending the northbound left-turn lanes at Stable Drive and Central Florida Parkway to improve traffic flow.
Project Status & Costs*
- Improving the traffic signals to include new signal heads with reflective backplates and new pedestrian signals.
- Upgrading pedestrian signals to allow for Leading Pedestrian Intervals (LPI) at specific locations to allow people to begin crossing while traffic is stopped.
- Evaluating and reconstructing pedestrian curb ramps as needed along the corridor to meet Americans with Disabilities Act (ADA) standards.
- Updating pavement markings and signage to guide both drivers and pedestrians.
Contact:
Contact: Shelley ChinQuee, P.E. FDOT Project Manager 386-943-5439 Shelley.ChinQuee@dot.state.fl.us www.cflroads.com/project/452882-1
Proposed improvements include:
The Florida Department of Transportation (FDOT) is proposing improvements along Orange Blossom Trail (U.S. 17-92/U.S. 441 (State Road (S.R.)) 500), from Mary Louis Lane at the Osceola County line to south of W. Taft Vineland Road in Orange County. The purpose of this project is to extend the service life of the roadway and enhance safety for pedestrians and drivers along the corridor.
| Design | Completion spring 2027 | $1.7 Million |
|---|---|---|
| Right of Way | Within existing | -- |
| Construction | Begin summer 2027 | $18.2 Million |
*Subject to change