• Access available for required on-site machinery, movement of and infrastructure for cattle and sufficient storage on-site for machinery or other habitat management aspects (e.g. storage of logs from coppicing or provision of corals for cattle – provide evidence that machinery and cattle can access the site as required. )

18 A monitoring plan Sets out when habitat surveys will take place as part of the 30 year monitoring plan for the Council for review over the 30 year period . Agree date for commencement Monitoring Report for review and how frequently LPA will receive reports

19 Permission for Devon LPAs to enter the land for spot checks Permission for spot inspections by ENPA officer(s) or a subcontractor to ensure habitat management is being undertaken as promised Statement of compliance

20 Agreement on how to deal with a fundamental breach of management prescriptions The ability to enforce a breach if management prescriptions and targets promised are not delivered Statement of compliance

21 How does the site meet BNG Best Practice Principles Outline of how the habitat bank meets the 10 key principles of BNG as per CIEEM 2016 directly in relation to the habitat bank. Is the Habitat Bank compliant with best practice as outlined in the British Standard BS 8683: 2021 and other subsequent guidance on habitat banks provided by Natural England / Defra that is available at the time of the agreement / survey and report production? Providers should provide brief written justification text to demonstrate how the proposals fit with best practice on BNG. Extent and detail of information required should be linked to size and complexity of habitats provided by the habitat bank. Evidence will need to include but not be limited to: Justification text in a report / statement of compliance