CITY OF EUSTIS 2026 PROPOSED UTILITY RATE INCREASE
2.5% Increase Effective on 6/1/26 - Reflected on July billing
WATER RATES
ResidentialCommercial (INCLUDES CONSTRUCTION METERS)
In-CityCommercial In-City
Availability Charge (Incl. 0 usage)$ 13.30Availability Charge (Incl. 0 usage)$ 26.63
Usage Charged Per 1,000 gallons0 to 8,000 gallonsUsage Charged Per 1,000 gallons0 to 30,000 gallons
8,001 to 20,000 gallons$ 2.78Over 30,000 gallons$ 2.78
20,001 to 30,000 gallons$ 3.47Over 30,000 gallons$ 3.45
Over 30,000 gallons$ 4.88
Outside City$ 11.09
Availability Charge (Incl. 0 usage)$ 16.63Availability Charge (Incl. 0 usage)$ 33.29
Usage Charged Per 1,000 gallons0 to 8,000 gallonsUsage Charged Per 1,000 gallons0 to 30,000 gallons
8,001 to 20,000 gallons$ 3.48Over 30,000 gallons$ 3.48
20,001 to 30,000 gallons$ 4.33Over 30,000 gallons$ 4.33
Over 30,000 gallons$ 6.09
RV ParksIndustrial
In-CityIndustrial In-City
Availability Charge (Incl. 0 usage)$ 4.44Availability Charge (Incl. 0 usage)$ 58.57
Usage Charged Per 1,000 gallons$ 2.78Usage Charged Per 1,000 gallons0 to 350,000 gallons
Over 350,000 gallons$ 2.78
Industrial Outside City$ 3.45
Outside CityIndustrial Outside City
Availability Charge (Incl. 0 usage)$ 5.54Availability Charge (Incl. 0 usage)$ 73.22
Usage Charged Per 1,000 gallons$ 3.48Usage Charged Per 1,000 gallons0 to 350,000 gallons
Over 350,000 gallons$ 3.49
STORMWATER$ 4.33
STORMWATERSTORMWATER
* All In-City Residential accounts get flat fee$ 8.00* All in-City Commercial accounts get flat fee$ 16.00
WASTEWATER RATES (SEWER)
ResidentialCommercial
In-CityCommercial In-City
Availability Charge (Incl. 0 usage)$ 31.30Availability Charge (Incl. 0 usage)$ 43.83
Usage Per 1,000 gallons, Max-10,000 gallons$ 3.92Usage per 1,000 gallons based on water consumption
All Usage$ 4.70
Outside CityCommercial Outside City
Availability Charge (Incl. 0 usage)$ 39.16Availability Charge (Incl. 0 usage)$ 54.78
Usage Per 1,000 gallons, Max-10,000 gallons$ 4.89Usage Per 1,000 gallons based on water consumption
All Usage$ 5.88
RV ParksIndustrial
In-CityIndustrial In-City
Availability Charge (Incl. 0 usage)$ 10.69Availability Charge (Incl. 0 usage)$ 75.13
Usage Per 1,000 gallons, Max-10,000 gallons$ 3.92Usage Per 1,000 gallons based on water consumption
(per Occupied Space)All Usage$ 4.70
Outside CityIndustrial Outside City
Availability Charge (Incl. 0 usage)$ 13.04Availability Charge (Incl. 0 usage)$ 93.91
Usage Per 1,000 gallons, Max-10,000 gallons$ 4.86Per 1,000 gallons based on water consumption
(per Occupied Space)All Usage$ 5.88