iv. Improving both sides of Chicago Avenue with a sidewalk and a NB on-road, climbing bike lane
Peanut Roundabout
Mini Roundabout
Offset Intersection
Curb Extensions
Curb Extensions (Removing the EB Slip Lane)
o Alternative Northend Greenway/Friendly City Trail Connector Alignments
Alignment A – Along College Avenue and through private property
Alignment B – Along Chicago Avenue and Waterman Drive
Alignment C – Along Woodleigh Court, Stuart Street, and Dogwood Drive
2-2