Table 6-3: LOS, Delay and Queue Length Summary
2034 Background Conditions
Intersection and Type of Control Movement and Approach Turn Lane Storage (ft) AM PEAK HOUR PM PEAK HOUR MIDDAY PEAK HOUR
Delay1 (sec/veh) LOS1 HCS 95th Percentile Queue Length (ft) Simulated Maximum Queue Length (ft) Delay1 (sec/veh) LOS1 HCS 95th Percentile Queue Length (ft) Simulated Maximum Queue Length (ft) Delay1 (sec/veh) LOS1 HCS 95th Percentile Queue Length (ft) Simulated Maximum Queue Length (ft)
Chicago Avenue (N-S) at Shenandoah Street (E-W) Unsignalized EB Left/Thru/Right 10.5 B 3 48 11.8 B 4 38 10.2 B 3 31
EB Approach 10.5 B 3 - 11.8 B 4 - 10.2 B 3 -
WB Left/Thru/Right 0.0 A 0 0 14.4 B 3 38 12.2 B 1 31
WB Approach 0.0 A 0 - 14.4 B 3 - 12.2 B 1 -
NB Left/Thru/Right 0.5 A 1 36 1.2 A 2 70 0.6 A 1 37
NB Approach 0.5 - 1 - 1.2 - 2 - 0.6 - 1 -
SB Left/Thru/Right 0.2 A 0 42 0.2 A 0 33 0.0 0 3
SB Approach 0.2 - 0 - 0.2 - 0 - 0.0 - 0 -
Chicago Avenue (N-S) at Greystone Street (E-W) Unsignalized EB Left/Thru/Right 10.0 B 9 55 12.6 B 12 51 10.2 B 7 40
EB Approach 10.0 B 9 - 12.6 B 12 - 10.2 B 7 -
NB Left/Thru/Right 1.6 A 3 61 3.1 A 8 87 2.1 A 4 66
NB Approach 1.6 3 - 3.1 8 - 2.1 4 -
SB Left/Thru/Right 0.0 0 0 0.0 0 6 0.0 0 2
SB Approach 0.0 0 - 0.0 0 - 0.0 0 -
Chicago Avenue (N-S) at Waterman Drive Unsignalized EB Left/Thru 16.1 C 43 100 39.4 E 146 169 14.3 B 28 86
EB Right 50 16.1 C 43 44 39.4 E 146 50 14.3 B 28 55
EB Approach 16.1 C 43 - 39.4 E 146 - 14.3 B 28 -
WB Left/Thru/Right 12.7 B 6 49 17.8 C 12 58 10.7 B 3 37
WB Approach 12.7 B 6 - 17.8 C 12 - 10.7 B 3 -
NB Left/Thru/Right 2.2 A 3 63 1.2 A 2 74 1.3 A 2 52
NB Approach 2.2 3 - 1.2 2 - 1.3 2 -
SB Left/Thru/Right 0.2 A 0 25 0.6 A 2 64 0.5 A 1 44
SB Approach 0.2 0 - 0.6 2 - 0.5 1 -
W Market Street (E-W) at Dogwood Drive (N-S) Signalized EB Left/Thru 7.2 A 101 121 10.7 B 78 146 9.6 A 50 123
EB Thru/Right 7.2 A 101 94 10.7 B 78 121 9.6 A 50 94
EB Approach 7.2 A 101 - 10.7 B 78 - 9.6 A 50 -
WB Left/Thru 6.6 A 71 103 11.6 B 102 203 9.7 A 51 137
WB Thru/Right 6.6 A 71 49 11.6 B 102 161 9.7 A 51 72
WB Approach 6.6 A 71 - 11.6 B 102 - 9.7 A 51 -
NB Left/Thru 21.6 C 60 95 11.0 B 68 118 9.3 A 38 96
NB Approach 20.7 C 60 - 10.4 B 68 - 9.0 A 38 -
NB Right 100 18.4 B 4 51 8.3 A 13 70 8.2 A 50
SB Left/Thru/Right 24.5 C 29 57 8.5 A 19 60 8.3 A 15 46
SB Approach 24.5 C 29 - 8.5 A 19 - 8.3 A 15 -
6-7