City of Harrisonburg Friendly City Trail Connection Preliminary Planning Cost Estimate - March 2025 City of Harrisonburg, Virginia CITYOF HARRISONBURG PUBLIC WORKS
(Input Length of Roadway, (FT)) Facility Classification
Shared Use Path
CONSTRUCTION BID COSTS
Grading & Earthwork $ 78,000.00
Roadway Improvements $ 59,000.00
Stormwater & Hydraulics 50% $ 69,000.00
Miscellaneous Construction 50% $ 103,000.00
Subtotal A = $ 309,000.00
OTHER BID COSTS FOR CONSTRUCTION
Mobilization for Subtotal A (Calc from VDOT formula) $ 29,000.00
Materials Testing 2% $ 7,000.00
Construction Engineering & Inspection 15% $ 53,000.00
Contingency for CN (Construction + Other) 50% $ 356,000.00
Subtotal B = $ 450,000.00
TOTAL ROADWAY CONSTRUCTION ITEMS (A + B): $ 759,000.00
PRELIMINARY ENGINEERING (DESIGN & ADMINISTRATIVE COSTS)
Survey, Design Services, & Permitting 20% $ 152,000.00
Construction Surveying 1.5% $ 5,000.00
Environmental Coordination 0% -
Contingency for PE 10% $ 16,000.00
Subtotal C = $ 168,000.00
GRAND TOTAL ROADWAY ITEMS (A+B+C): $ 927,000.00
RIGHT OF WAY & UTILITY COSTS
Utility Coordination & Relocation 15% $ 140,000.00
Right of Way - Administrative Costs
Right of Way - Acquisition Costs
Contingency for Right of Way/Utility 50% $ 70,000.00
ROW Subtotal = $ 210,000.00
SUMMARY OF BUDGET PHASES
Right of Way (RW) $ 210,000.00
Construction (CN) $ 759,000.00
TOTAL RECOMMENDED PROJECT BUDGET $ 1,137,000.00
Preliminary Engineering (PE) $ 168,000.00