uparrowdownarrowdownarrowuparrowuparrowuparrowdownarrowdownarrowdownarrowdownarrow
MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Lane Configurationsuparrowuparrowuparrowuparrowuparrowuparrow
Traffic Volume (vph)8352842247614113263661324
Future Volume (vph)8352842247614113263661324
Ideal Flow (vphpl)190019001900190019001900190019001900190019001900
Total Lost time (s)4.54.54.54.54.5
Lane Util. Factor0.950.951.001.001.00
Frt0.971.001.000.850.93
Flt Protected1.001.000.961.000.99
Satd. Flow (prot)34773588181216151666
Flt Permitted0.940.930.751.000.96
Satd. Flow (perm)32853326142016151619
Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92
Adj. Flow (vph)9383912451715123283971426
RTOR Reduction (vph)044004000230160
Lane Group Flow (vph)04390055200151160310
Heavy Vehicles (%)0%1%0%0%0%0%0%4%0%17%0%4%
Turn TypePermNAPermNAPermNAPermPermNA
Protected Phases4826
Permitted Phases48226
Actuated Green, G (s)18.018.018.018.018.0
Effective Green, g (s)18.018.018.018.018.0
Actuated g/C Ratio0.400.400.400.400.40
Clearance Time (s)4.54.54.54.54.5
Lane Grp Cap (vph)13141330568646647
v/s Ratio Prot
v/s Ratio Perm0.13c0.17c0.110.010.02
v/c Ratio0.330.410.270.020.05
Uniform Delay, d19.39.79.18.28.3
Progression Factor1.001.001.001.001.00
Incremental Delay, d20.71.01.10.10.1
Delay (s)10.010.710.28.28.4
Level of ServiceBBBAA
Approach Delay (s)10.010.79.88.4
Approach LOSBBAA
Intersection Summary
HCM 2000 Control Delay10.2HCM 2000 Level of ServiceB
HCM 2000 Volume to Capacity ratio0.34
Actuated Cycle Length (s)45.0Sum of lost time (s)9.0
Intersection Capacity Utilization51.6%ICU Level of ServiceA
Analysis Period (min)15

c Critical Lane Group