| Activity | Year 1 | Year 2 | Year 3 | Year 4 |
|---|
| Breathing Apparatus replacement to improve firefighter safety | | | | |
| Decontamination following a fire | | | | |
| Develop a more flexible use of wholetime resources | | | | |
| Embed new software to enhance prevention activities | | | | |
| Enhanced tactical ventilation capability to improve safety and shorten incident duration | | | | |
| Fire cover optimisation to improve cover in line with risk | | | | |
| Full replacement of PPE | | | | |
| Increase tailored prevention work in areas outside of target attendance times | | | | |
| Increase the recruitment area for on-call firefighters | | | | |
| Increased ability to deal with new fire threats: battery storage systems, building materials | | | | |
| Establish resource deployment software | | | | |
| Review and update firefighting tactics | | | | |
| Review fire response targets | | | | |
| Training facilities project | | | | |
| Wholetime shift adjustment: establishment | | | | |
| Boat replacement | | | | |
| Boats, trailers, vehicles project | | | | |
| Enhance our rural prevention activities: flooding | | | | |
| Enhanced casualty location (drones and thermal imaging) and responder safety equipment | | | | |
| Establish a HVP tactical advisor role | | | | |
| Flood response capability: increased number firefighters trained | | | | |
| Improve the management of the command and control | | | | |
| Increase our prevention work in ‘rapid catchment areas’ | | | | |
| Towing vehicles | | | | |
| Water incident manager training | | | | |
| Enhance HAZMAT skills and knowledge: radiation advisor role and training | | | | |
| EPU refresh | | | | |
| Improve HAZMAT advisor coverage per resilience group | | | | |
| Identification of BESS in homes and businesses | | | | |
| Improve working with partners to reduce and respond to chemical suicides | | | | |
| Improved notification at and inspection of relevant sites regarding hazardous substances | | | | |
| Specialist PPE project | | | | |