PAGERS_COST2026 BUDGETED2026 ESTIMATED20272028202920302031
WASTEWATER CAPITAL PROJECTS
SEWER CLEANING MACHINE100,000100,000
EXTRACTOR WITH VALVE EXERCISER (50/50 SPLIT WATER/WASTE)80,00030,000
TRUCK REPLACEMENT 4X440,00040,000
TRACTOR WITH BUSH HOG (ADDED TO TRACTOR)120,000120,00071,495
MASTER LIFT STATION UPGRADE (BYPASS PUMP)M
LOCATE MACHINE GPR (SPLIT BETWEEN W/W)M32,50022,5009,879
BACKHOE (SPLIT BETWEEN STREETS 410420/425)25,00025,000
FOLDING MACHINE FOR CUSTOMER SERVICE1,0001,0001,000
MID-SIZE PICKUP TRUCK28,00028,000
LIFT STATION 2 REHAB70,00070,000
LIFT STATION PUMPS25,00025,000
GRANT FUNDING:
WASTEWATER COLLECTION SYSTEM / LIFT STATION UPGRADES (Hydraulic model, lift station replacement/rehab, lining)4,524,8002,980,95945,6702,945,2891,533,841
PLANNING (Collection system cleaning/inspection, flow monitoring, SCADA analysis, Asset Management) (Move to 2027)1,492,0001,492,000
SUBTOTALS6,710,9483,164,459127,0444,586,2891,683,84140,000
Legend of Funding Sources:
A - General Fund
G - Electric Fund
Loan Repaid by General Fund
F - Loan Repaid by Electric Fund
Local Option Gas Tax
D - Loan Repaid by Local Option Gas Tax
H - Sanitation Fund
K - Loan Repaid by Water Fund
M - Wastewater Fund