PAGE 6RS_COST2026 BUDGETED2026 ESTIMATED20272028202920302031
WATER CAPITAL PROJECTS
HIGH SERVICE PUMP25,00025,000
FOLDING MACHINE FOR CUSTOMER SERVICE1,0001,000
UTILITY TRUCK108,00050,00057,86758,000
EXTRACTOR WITH VALVE EXERCISER (50/50 SPLIT WATER/W)80,00030,00050,000
HYDRANT MOVERS (2)45,0006,0003,57515,0006,0006,0006,0006,000
LOCATE MACHINE GPR (SPLIT BETWEEN WM)22,50022,5009,879
BACKHOE (SPLIT BETWEEN STREETS 410/420/425)25,00025,000
750,000 GALLON ELEVATED WATER TANK EXTERIOR RENOVATION70,00070,00070,000
EASEMENT FOR WATER INTERCONNECT PROJECT57,00057,000
GRANT FUNDING:
DISTRIBUTION SYSTEM IMPROVEMENT (Eliminate dead ends Welker Ave Loop, N Main St Loop, Lead Main Repl, Commercial Meter Repl)3,697,2002,021,5403,543,080154,120
WP1 UPGRADES (Replace chemical feed equip & high service pumps, generator & gen fuel tank)M869,000879,70089,300
WP2 UPGRADE (Replace generator, well pumps, high service pump and chemical feed pumps)M1,261,000621,9001,144,800116,200
FSWP UPGRADES (Replace pumps and fire flow pumps)1,300,000975,000325,000
PLANNING (Lead & copper rule study, GIS Mapping, Hydraulic Model, SCADA Asset Management)332,10099,000
BUSHNELL/SUMT. CROSSTIE WMM1,300,0001,287,50043,0001,252,000
@DW600470 SUPPLEMENTAL APPROPRIATION MILTON/HELENE GRANTK5,895,0005,895,000
SUBTOTALS75,237,8005,687,290241,32170,794,0802,559,620211,5006,0006,000