PAGE 5RS_COST2026 Budgeted2026 Estimated20272028202920302031
ELECTRIC CAPITAL PROJECTS
REPLACEMENT VEHICLE (F-150 DIRECTOR VEHICLE)55,000
ALTEC BUCKET TRUCK (4 WHEEL DRIVE)254,000254,000245,125
SERVICE TRUCK REPLACEMENT65,08065,000
POLE TRAILER30,000
WIRE PULLER5,0005,000
AEDs FOR UTILITY TRUCKS & BUILDING (8 AEDs)16,000
BACKHOE (SPLIT BETWEEN STREETS/410/420/425)DEL25,000
CAPITAL IMPROVEMENTS WPZ EMERGENCY REPAIR IN 2025150,00025,00025,00025,00025,000
AUTOMATED METER INFRASTRUCTURE (POSSIBLE GRANT FUNDS)1,600,000750,000750,000
GRANT:
SUBSTATION PLANNING PHASE10,000,000
SUBTOTALS12,100,000270,000259,43510,830,000840,00030,00025,000

Legend of Funding Sources:

A - General Fund

B - Loan Repaid by General Fund

C - Local Option Gas Tax

D - Loan Repaid by Local Option Gas Tax

"I" represents increase, "D" represents decrease, "C" represents completed

B - Electric Fund

F - Loan Repaid by Electric Fund

H - Sanitation Fund

Loan Repaid by Sanitation Fund

J - Grants

K - Loan Repaid by Water Fund

M - Wastewater Fund