2023-2024 Budget2024-2025 Budget2025-2026 Budget7 Month Actual Year to DateEstimated 2025-2026Proposed 2026-2027 Budget
Lift Station 2 Rehab70,000
UR Station Pumps26,000
Backhoe (Split Between Streets/410/420/425)25,000
Grant Funded Projects:
Wastewater Facility/Master Plan (DEP Grant/Loan)
Design Engineering for Wastewater Plant Expansion Project (DEP Grant/Loan)864,000
250,000
Wastewater Treatment Plant Expansion Project (Const) (DEP/USDA/DEQ Grant/Loan) (Move to 426)5,825,8005,825,80031,825,340
Wastewater Collection System/Lift Station Upgrades (CW600441 & Additional Funding)277,8002,123,5002,990,95945,6702,945,289
Wastewater System Planning
SBR4 Repairs Funded by SRF Loan (Emergency Funding)500,00020,000
Planning (Collection System Cleaning, Inspection, Flow Monitoring, SCADA Analysis, Asset Management)1,492,000
Loan Payments:
Principal SRF Loan Hanson Plant CW876080 (Webster)63,23764,61768,02632,83565,02687,487
Principal 2017 Water & Sewer Refunding Bond97,200100,800104,40010,400104,400122,400
Principal SRF Loan WW600440 (Facility Master Plan)8,4508,4508,4504,2258,4508,460
Principal SRF Loan W60044147,70018,23436,48836,468
Principal SRF Loan WW800450 (SBR4 Emergency Repair)5,77553,55012,75053,55053,660
Total Expense8,262,4878,480,91335,273,075159,818297,4704,874,624
Budget Excess/Deficit