Page 3 of 6

Ceragon Networks Inc. submitted the lowest responsive and responsible bid that met all requirements outlined in the specifications. Staff recommends authorizing a contract not to exceed of $829,972, which includes Wi-Fi equipment and installation services, as well as five years of maintenance beginning upon completion of installation, and a twenty percent contingency. A breakdown of the proposed contract is below:

Base Implementation Amount$667,783
Maintenance & Support (5 Year)$23,860
Contingency Allowance (20%)$138,329
Contract “Not To Exceed” Amount$829,972

Ceragon Networks Inc. is a well-qualified provider of wireless communication solutions, with extensive experience deploying large-scale Wi-Fi infrastructure for municipalities and public spaces. They have a proven track record in designing, installing, and maintaining high-performance Wi-Fi networks.

There are currently no open purchase orders or contracts with Ceragon Networks Inc.

Splicing and Testing of Fiber Optic Cable

This is for splicing and testing of fiber optic cables for the Public Parks Wireless Wi-Fi Network, as well as ongoing as-needed services for the City's entire fiber network. Following the Notice Inviting Bids on August 21, 2025, a total of forty vendors downloaded the bid specifications, and four responses were received by the submission deadline of September 11, 2025. After reviewing all submissions for compliance and qualifications, Crosstown Electrical & Data, Inc., was determined to be the lowest responsible bidder.

BidderAmount
1. Crosstown Electrical & Data, Inc.Irwindale, CA$1,002,780
2. SECC CorporationCorona, CA$2,175,696
3. Select Electric, Inc.Anaheim, CA$2,523,485

Crosstown Electrical & Data, Inc. submitted the lowest responsive and responsible bid that met all requirements outlined in the specifications. Staff recommends authorizing a contract not to exceed of $1,103,058, which includes splicing, testing, and procurement of fiber optic related materials and a ten percent contingency. A breakdown of the proposed contract is below:

Base Implementation Amount$1,002,780
Contingency Allowance (10%)$ 100,278
Contract “Not To Exceed” Amount$1,103,058

Crosstown Electrical & Data, Inc. is a Southern California-based electrical contracting firm incorporated in 1998 with extensive experience delivering electrical and communications infrastructure for public-sector projects. They specialize in complex electrical and data infrastructure work, including electrical systems, intelligent