PAGE 7AF.S.COST2026 BUDGETED2026 ESTIMATED20272028202920302031
WASTEWATER CAPITAL PROJECTS
SEWER CLEANING MACHINEM100,000100,000
EXTRACTOR WITH VALVE EXERCISER (50/50 SPLIT WATER/WW)/M80,00030,000050,000
TRUCK REPLACEMENT 4X4M40,00040,000
TRACTOR WITH BUSH HOG (ADDED TO TRACTOR)M120,000120,00071,495
MASTER LIFT STATION UPGRADE (BYPASS PUMP)M0
LOCATE MACHINE / GPR (SPLIT BETWEEN W/WW)M32,50022,5009,879
BACKHOE (SPLIT BETWEEN STREETS/410/420/425)M25,00025,000
FOLDING MACHINE FOR CUSTOMER SERVICEM1,0001,00001,000
MID-SIZE PICKUP TRUCKNM28,00028,000
LIFT STATION 2 REHABNM70,00070,000
LIFT STATION PUMPSNM25,00025,000
GRANT FUNDING:
WASTEWATER COLLECTION SYSTEM/LIFT STATION UPGRADES (Hydraulic model, lifstation replacement/rehab, lining)O4,524,8002,990,95945,6702,945,2891,533,841
PLANNING (Collection system cleaning/inspection, flow monitoring, SCADA analysis, Asset Management) (Move to 2027)O1,492,0001,492,000
SUBTOTALS6,710,9483,164,459127,0444,586,2891,683,841040,0000
LEGEND OF FUNDING SOURCES:
A- GENERAL FUNDE- ELECTRIC FUND
B- LOAN REPAID BY GENERAL FUNDF- LOAN REPAID BY ELE FUND
C- LOCAL OPTION GAS TAXG- WATER FUND
D- LOAN REPAID BY LOCAL OPTION GAS TAXH- SANITATION FUND
K- LOAN REPAID BY WATER FUND
M- WASTEWATER FUND
O- GRANT/LOAN REPAID BY WASTEWATER FUND
LEGEND OF COLUMN "A"
"I" REPRESENTS INCREASE\n"D" REPRESENTS DECREASE\n"C" REPRESENTS COMPLETED"DEL" REPR DELETION\n"N" REPR NEW ITEM\n"M" REPRESENTS MOVED