PAGE 5AF.S.COST2026 BUDGETED2026 ESTIMATED20272028202930303031
ELECTRIC CAPITAL PROJECTS
REPLACEMENT VEHICLE (F-150 DIRECTOR VEHICLE)E55,00055,000
ALTEC BUCKET TRUCK (AA55E - 4 WHEEL DRIVE)F254,000254,000245,125
SERVICE TRUCK REPLACEMENTF65,00065,000
POLE TRAILERE30,000
WIRE PULLERE5,0005,000
AEDs FOR UTILITY TRUCKS & BUILDING (8 AEDs)E16,00016,00014,310
BACKHOE (SPLIT BETWEEN STREETS/410/420/425)DELDELE25,000
CAPITAL IMPROVEMENTS (WP2 EMERGENCY REPAIR IN 2025)E150,00025,00025,00025,00025,000
AUTOMATED METER INFRASTRUCTURE (POSSIBLE GRANT FUNDS)NNE1,500,000750,000750,000
GRANT:
SUBSTATION PLANNING PHASEJ10,000,00010,000,000
SUBTOTALS12,100,000270,000259,435010,830,000840,00030,00025,000
LEGEND OF FUNDING SOURCES:
A- GENERAL FUNDE- ELECTRIC FUND
B- LOAN REPAID BY GENERAL FUNDF- LOAN REPAID BY ELE FUND
C- LOCAL OPTION GAS TAXG- WATER FUND
D- LOAN REPAID BY LOCAL OPTION GAS TAXH- SANITATION FUND
I- LOAN REPAID BY SANI FUND
J- GRANTS
K- LOAN REPAID BY WATER FUND
M- WASTEWATER FUND
O- LOAN REPAID BY WASTEWATER FUND
"I" REPRESENTS INCREASE"DEL" REPR DELETION
"D" REPRESENTS DECREASE"N" REPR NEW ITEM
"C" REPRESENTS COMPLETED"M" REPRESENTS MOVED