WASTEWATER CAPITAL BUDGET

2023-2024 Budget2024-2025 Budget2025-2026 Budget7 Month Actual Year to DateEstimated 2025-2026Proposed 2026-2027 Budget
FUNDING SOURCES:
BudgetBudgetBudgetYear to Date2025-20262030-2031 Budget
CASH PROVIDED FROM OPERATIONS544,887181,613456,776159,818251,800437,335
GRANT/LOAN REVENUE DEP FOR WASTEWATER FACILITY/MASTER PLAN (50% Grant/50% Loan)000000
GRANT/LOAN REVENUE DEP FOR DESIGN ENGINEERING WASTEWATER PLANT EXPANSION -LPA GRANT884,00000000
GRANT/LOAN REVENUE DEP FOR WASTEWATER PLANT EXPANSION PROJECT (OTHER FUNDING SOURCE)250,00000000
GRANT/LOAN REVENUE DEP FOR WASTEWATER PLANT EXPANSION PROJECT (DEP/USDA/DEO)5,825,8005,825,80031,825,340000
DEP LOAN FRO REPAIRS TO SBR4 (EMERGENCY LOAN)500,000200,0000000
WASTEWATER COLLECTION SYSTEM (GRANT/LOAN FUNDED)277,8002,123,5002,990,959045,6702,945,289
WASTEWATER SYSTEM PLANNING (GRANT/LOAN FUNDING)000001,492,000
GRANT REVENUE FROM DEO FOR MASTER LIFT STATION UPGRADES (100% GRANT FUNDED)000000
POSSIBLE ARPA GRANT FUNDS FROM SUMTER COUNTY TO PURCHASE0150,0000000
UTILIZATION OF RETAINED EARNINGS000000
***TOTAL REVENUES***8,262,4878,480,91335,273,075159,818297,4704,874,624
CAPITAL PROJECTS:
SALARIES AND RELATED EXPENDITURES01,9713,150000
LIFT STATION SHOP UPGRADES000000
NEW SERVER (2ND)1,00000000
MASTER LIFTSTATION UPGRADE (BYPASS PUMP)65,00065,0000000
LOCATE MACHINE / GPR (SPLIT BETWEEN 420/425)10,00010,00022,5009,8799,8790
SBR4 REPAIRS300,00000000
PORTABLE GENERATOR075,0000000
FOLDING MACHINE FOR CUSTOMER SERVICE001,000001,000
TRACTOR WITH BUSH HOG00120,00071,49571,4950
EXTRACTOR WITH VALAVE EXERCISER (SPLIT WITH WATER 50/50)0030,000000
MID-SIZE PICKUP TRUCK0000028,000
LIFT STATION 2 REHAB0000070,000
LIFT STATION PUMPS0000025,000
BACKHOE (SPLIT BETWEEN STREETS/410/420/425)25,000
GRANT FUNDED PROJECTS:
WASTEWATER FACILITY/MASTER PLAN (DEP Grant/Loan)000000
DESIGN ENGINEERING FOR WASTEWATER PLANT EXPANSION PROJECT (DEP Grant/Loan)864,00000000
INTERIM WASTEWATER TREATMENT PLANT EXPANSION PROJECT (Construction) (DEP/USDA/DEO GRANT/LOAN)250,00000000
WASTEWATER TREATMENT PLANT EXPANSION PROJECT (CONST) (DEP/USDA/DEO GRANT/LOAN) (MOVE TO 428)5,825,8005,825,80031,825,340000
WASTEWATER COLLECTION SYSTEM/LIFT STATION UPGRADES (CW600441 & ADDITIONAL FUNDING)277,8002,123,5002,990,959045,6702,945,289
WASTEWATER SYSTEM PLANNING000000
SBR4 REPAIRS FUNDED BY SRF LOAN (EMERGENCY FUNDING)500,000200,0000000
PLANNING (Collection system cleaning/inspection, flow monitoring, SCADA analysis, Asset Management)1,492,000
LOAN PAYMENTS:
PRINCIPAL SRF LOAN HANSON PLANT CW676060 (Webster)63,23764,61766,02632,83566,02667,487
PRINCIPAL 2017 WATER & SEWER REFUNDING BOND97,200100,800104,40010,400104,400122,400
PRINCIPAL SRF LOAN WW600440 (FACILITY MASTER PLAN)8,4508,4508,4504,2258,4508,450
PRINCIPAL SRF LOAN WW6004410047,70018,23436,46836,468
PRINCIPAL SRF LOAN WW600450 (SBR4 EMERGENCY REPAIR)05,77553,55012,75053,55053,550
***TOTAL EXPENSE***8,262,4878,480,91335,273,075159,818297,4704,874,624

BUDGET EXCESS/DEFICIT