[
    {
        "page": 1,
        "items": [
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 28.08,
                    "t": 690,
                    "r": 292.08,
                    "b": 506.64
                },
                "text": "The Florida Department of Transportation (FDOT), District One is hosting in-person and virtual public meetings on the County Line Road Project Development and Environment (PD&E) Study. These meetings are being held to provide the public with an additional opportunity to participate and comment to gain more feedback that is critical for our study. This study will include traffic and pedestrian improvements along both County Line Road and US 92. The County Line Road study limits extend from Amberjack Boulevard North to Frontage Road South shown in the Project location Map below. The need for this project is to enhance safety for the traveling public along the County Line Road corridor by separating vehicle and pedestrian movements from the railroad crossing. All materials including the presentation are available on the project website. https://www.swflroads.com/project/446404-1",
                "reading_order": 0
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 36.96,
                    "t": 493.68,
                    "r": 276.96,
                    "b": 205.2
                },
                "text": "",
                "reading_order": 1
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 43.92,
                    "t": 493.44,
                    "r": 196.32,
                    "b": 479.28
                },
                "text": "PROJECT LOCATION MAP",
                "reading_order": 2
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 308.88,
                    "t": 691.68,
                    "r": 574.56,
                    "b": 590.4
                },
                "text": "",
                "reading_order": 3
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 403.92,
                    "t": 604.08,
                    "r": 470.16,
                    "b": 592.32
                },
                "text": "County Line Rd.",
                "reading_order": 4
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 308.88,
                    "t": 581.28,
                    "r": 575.52,
                    "b": 540.48
                },
                "text": "County Line Road proposed six-lane typical section consists of three-lanes in each direction (36 ft wide) separated by a 30 ft median with 10 ft shared use paths on both sides.",
                "reading_order": 5
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 294.96,
                    "t": 502.56,
                    "r": 570,
                    "b": 228.48
                },
                "text": "",
                "reading_order": 6
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 512.88,
                    "t": 261.6,
                    "r": 571.44,
                    "b": 234
                },
                "text": "Crossing ID\n624304R",
                "reading_order": 7
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 332.16,
                    "t": 222.24,
                    "r": 525.36,
                    "b": 208.32
                },
                "text": "The CSX crossing has an average of 15 trains per day.",
                "reading_order": 8
            },
            {
                "page": 1,
                "type": "TITLE",
                "location": {
                    "l": 42.24,
                    "t": 190.32,
                    "r": 232.8,
                    "b": 175.2
                },
                "text": "HOW TO PROVIDE A COMMENT",
                "reading_order": 9,
                "level": 2
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 45.12,
                    "t": 155.52,
                    "r": 70.08,
                    "b": 124.32
                },
                "text": "",
                "reading_order": 10
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 43.92,
                    "t": 114.24,
                    "r": 69.36,
                    "b": 93.12
                },
                "text": "",
                "reading_order": 11
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 44.88,
                    "t": 85.2,
                    "r": 70.08,
                    "b": 67.68
                },
                "text": "",
                "reading_order": 12
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 44.4,
                    "t": 57.84,
                    "r": 70.32,
                    "b": 40.56
                },
                "text": "",
                "reading_order": 13
            },
            {
                "page": 1,
                "type": "TITLE",
                "location": {
                    "l": 75.6,
                    "t": 156.48,
                    "r": 137.52,
                    "b": 140.16
                },
                "text": "Adam Rose",
                "reading_order": 14,
                "level": 2
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 74.88,
                    "t": 137.28,
                    "r": 234,
                    "b": 120
                },
                "text": "FDOT District One Project Manager",
                "reading_order": 15
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 73.92,
                    "t": 110.88,
                    "r": 302.88,
                    "b": 93.36
                },
                "text": "801 N. Broadway Ave., MS 1-40, Bartow, FL 33830",
                "reading_order": 16
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 74.64,
                    "t": 84,
                    "r": 186.24,
                    "b": 67.2
                },
                "text": "Phone: (863) 519-2832",
                "reading_order": 17
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 74.4,
                    "t": 56.4,
                    "r": 227.28,
                    "b": 39.6
                },
                "text": "Email: adam.rose@dot.state.fl.us",
                "reading_order": 18
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 325.2,
                    "t": 156.72,
                    "r": 444,
                    "b": 98.88
                },
                "text": "To use the online comment form, visit the project webpage:",
                "reading_order": 19
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 326.64,
                    "t": 85.92,
                    "r": 451.44,
                    "b": 51.84
                },
                "text": "https://www.swflroads.com/project/446404-1",
                "reading_order": 20
            },
            {
                "page": 1,
                "type": "FIGURE",
                "location": {
                    "l": 455.28,
                    "t": 160.32,
                    "r": 566.4,
                    "b": 38.64
                },
                "text": "",
                "reading_order": 21
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 481.2,
                    "t": 63.84,
                    "r": 557.76,
                    "b": 48.48
                },
                "text": "SCAN HERE",
                "reading_order": 22
            }
        ]
    },
    {
        "page": 2,
        "items": [
            {
                "page": 2,
                "type": "TEXT",
                "location": {
                    "l": 474.24,
                    "t": 726,
                    "r": 577.92,
                    "b": 713.04
                },
                "text": "FPID No.: 446404-1",
                "reading_order": 0
            },
            {
                "page": 2,
                "type": "FIGURE",
                "location": {
                    "l": 35.04,
                    "t": 688.56,
                    "r": 364.32,
                    "b": 504.48
                },
                "text": "",
                "reading_order": 1
            },
            {
                "page": 2,
                "type": "TEXT",
                "location": {
                    "l": 369.84,
                    "t": 637.92,
                    "r": 570.48,
                    "b": 596.88
                },
                "text": "ALTERNATIVE 1 - This is an elevated intersection.\nElevating both County Line Road and US 92.\nCounty Line Road goes over CSX A-Line.",
                "reading_order": 2
            },
            {
                "page": 2,
                "type": "TEXT",
                "location": {
                    "l": 34.08,
                    "t": 492.72,
                    "r": 267.84,
                    "b": 466.08
                },
                "text": "ALTERNATIVE 2 - This is a northeast quadrant roadway with County Line Road going over both CSX A-Line and US 92.",
                "reading_order": 3
            },
            {
                "page": 2,
                "type": "FIGURE",
                "location": {
                    "l": 34.8,
                    "t": 465.36,
                    "r": 297.6,
                    "b": 279.6
                },
                "text": "",
                "reading_order": 4
            },
            {
                "page": 2,
                "type": "TEXT",
                "location": {
                    "l": 313.92,
                    "t": 492.72,
                    "r": 550.08,
                    "b": 466.08
                },
                "text": "ALTERNATIVE 3 - This is a northwest quadrant roadway with County Line Road going over both CSX A-Line and US 92.",
                "reading_order": 5
            },
            {
                "page": 2,
                "type": "FIGURE",
                "location": {
                    "l": 314.4,
                    "t": 466.32,
                    "r": 577.2,
                    "b": 280.08
                },
                "text": "",
                "reading_order": 6
            },
            {
                "page": 2,
                "type": "FIGURE",
                "location": {
                    "l": 37.44,
                    "t": 274.8,
                    "r": 574.8,
                    "b": 116.16
                },
                "text": "",
                "reading_order": 7
            },
            {
                "page": 2,
                "type": "TEXT",
                "location": {
                    "l": 37.68,
                    "t": 103.68,
                    "r": 565.2,
                    "b": 21.84
                },
                "text": "FDOT is sending notices to property owners, business owners, interested persons and organizations within 300 feet of the project to provide the opportunity to give comments to FDOT regarding these projects. FDOT solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or family status. People who require special accommodations under the Americans with Disabilities Act or who require translation services (free of charge) should contact Cynthia Sykes, District One Title VI Coordinator, at (863) 519-2287, or email at Cynthia.Sykes@dot.state.fl.us at least seven days prior to the meeting. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by FDOT pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated May 26, 2022, and executed by FHWA and FDOT. Nos importa mucho la opinión del público sobre el proyecto. Si usted tiene preguntas o comentarios, o si simplemente desea más información, por favor comuníquese con nuestro representante, Karina Della Sera, (863) 519-2750, karina.dellasera@dot.state.fl.us, Departamento de Transportación de la Florida, 801 N. Broadway Avenue, Bartow, FL 33830.",
                "reading_order": 8
            }
        ]
    }
]