The Florida Department of Transportation (FDOT), District One is hosting in-person and virtual public meetings on the County Line Road Project Development and Environment (PD&E) Study. These meetings are being held to provide the public with an additional opportunity to participate and comment to gain more feedback that is critical for our study. This study will include traffic and pedestrian improvements along both County Line Road and US 92. The County Line Road study limits extend from Amberjack Boulevard North to Frontage Road South shown in the Project location Map below. The need for this project is to enhance safety for the traveling public along the County Line Road corridor by separating vehicle and pedestrian movements from the railroad crossing. All materials including the presentation are available on the project website. https://www.swflroads.com/project/446404-1
FDOT District One Project Manager
801 N. Broadway Ave., MS 1-40, Bartow, FL 33830
Phone: (863) 519-2832
Email: adam.rose@dot.state.fl.us
To use the online comment form, visit the project webpage: