S.R. 789 from Bird Key Drive to Sunset Drive: Construction project: This project includes the addition of dedicated bicycle and transit lanes on the bridge, drainage upgrades, and raising the seawall cap near Sunset Drive. Other project activities include resurfacing the roadway throughout the project corridor and the installation of new traffic signals at the intersections of Sunset Drive, Golden Gate Drive, and Bird Key Drive. The project also includes relocating palm trees and small shrubs from their current locations on the eastern area of the John Ringling Causeway to medians closer to St. Armands Circle.
Sunset Drive will be temporarily closed at the Ritz entrance off Gulfstream Avenue (S.R. 789) to accommodate driveway reconstruction and related roadway improvements. The closure is anticipated to remain in place for approximately 60 days. Please follow posted detours, traffic-control devices, and directions from construction personnel.
This week's work will consist of:
Pedestrians should use designated paths and follow posted detour signs. Bike lanes are closed due to construction. Cyclists should follow the posted detour.