Variable message signs will be in place to alert drivers that work is underway. Estimated completion is late 2029.
I-75 at Toledo Blade Boulevard (exit 179) and Sumter Boulevard (exit 182) Interchange Improvements: FDOT is making improvements to the I-75 at Toledo Blade Boulevard and I-75 at Sumter Boulevard interchanges. Improvements for both interchanges include the installation of signals at both ramp connections, controlled pedestrian crosswalks, intersection lighting, and the addition of northbound I-75 free flow on-ramps from southbound Toledo Blade Boulevard and from southbound Sumter Boulevard. In addition, northbound lanes will be widened to provide two full lanes through the Toledo Blade Boulevard interchange. At the Sumter Boulevard interchange, dual left turn lanes will be added from northbound Sumter Boulevard onto northbound I-75.
The following activities are subject to change based on weather conditions and unforeseen underground conditions.
Sumter Boulevard Interchange:
Toledo Blade Boulevard Interchange:
Lane/ramp closure restrictions:
Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is early 2027. For more information please visit: https://www.swflroads.com/project/452356-1.