Work hours will be from 7 a.m. to 7 p.m.
Crews will remove the existing driveway entrance and reconstruct the driveway from the right-of-way to U.S. 98.
Motorists should use caution, watch for workers and equipment, and expect possible delays while traveling through the work area.
S.R. 70 Eastbound from Southwest 87th Terrace to Southwest 85th Avenue Utility maintenance project: Crews will replace damaged FPL utility poles along eastbound S.R. 70.
Daytime lane closures will occur from 9 a.m. to 4 p.m. while the work is underway.
Work is scheduled from Monday, September 28, through Friday, October 2, 2026, and continues through October 30, 2026.
Motorists should expect possible delays, use caution, and watch for workers and equipment in the work zone.
S.R. 70 from West of Northeast 31st Avenue to the St. Lucie County Line in Okeechobee County: Testing operation: Crews will perform Falling Weight Deflection testing along S.R. 70.
Work is scheduled for Monday, November 2, 2026, from 11:30 a.m. to 5 p.m.
No lane closures are planned; however, motorists should expect a mobile operation moving through the project limits.
Drivers should use caution, watch for workers and testing equipment, and be prepared for possible brief traffic slowdowns.
I-4 at S.R. 33 (Exit 38) in Lakeland: Construction project: Project improvements include reconstructing the existing interchange, reconstructing I-4 bridges over S.R. 33, widening and resurfacing S.R. 33, constructing wildlife crossings over I-4 and under S.R. 33, and adding noise walls along S.R. 33. This week crews will work on clearing vegetation, installing barrier walls, paving operations for on-off ramps, pavement markings, drainage operations, and utility work.
Nightly, from 9:30 p.m. to 6 p.m., crews will close and detour northbound and southbound S.R. 33 for pile extraction from Sunday, November 1, 2026, to