Pedestrian access has been shifted to the south side of Daniels Parkway. Please follow signs and proceed with caution in the work zone.
Motorists should expect trucks and equipment to be moving materials throughout the project.
Please use caution and watch for workers and construction vehicles entering and leaving the roadway. The expected completion date is summer 2028. For more information please visit: https://www.swflroads.com/project/446296-2.
Business 41 over Edison Bridge (120157 and #120158): Construction project: Beginning Friday, July 31, through winter 2026, between 9 p.m. and 6 a.m., motorists should expect intermittent nighttime/overnight northbound and southbound lane closures on the Edison Bridge. Crews will be performing work on bridge joints. Motorists should use caution as they travel through the work zone. For more information, please visit: https://www.swflroads.com/project/451357-1
U.S. 41 over the Caloosahatchee Bridge (#120002): Construction project: Beginning Thursday, May 21, through winter 2026, between 9 p.m. and 6 a.m., motorists should expect intermittent nighttime/overnight northbound and southbound lane closures on the Caloosahatchee Bridge. Crews will be conducting pile jacket work. Motorists should use caution as they travel through the work zone. For more information, please visit: https://www.swflroads.com/project/451357-1
S.R. 884 (Colonial Boulevard) from Winkler Avenue to Forum Boulevard: Warranty/Maintenance project: Motorists can expect to see nighttime/overnight lane closures throughout October between 7:30 p.m. and midnight on S.R. 884 eastbound and westbound. Crews will be maintaining the yellow striping on the roadway beginning with the inside lanes and then switching to the outside lanes. Motorists can expect slow-moving traffic while this work is being performed.
S.R. 82 at The Forum Boulevard: Permit project: Motorists should expect nighttime/overnight lane closures on S.R. 82 eastbound and westbound beginning Monday, September 28, through Tuesday, November 24, 2026, between 7 p.m. and 6 a.m. Crews will be installing mast arms. Motorists should expect slow-moving traffic and should use caution when traveling through the work zone.
S.R. 82 at Colonial Boulevard: Maintenance project: Motorists can expect nighttime/overnight lane closures beginning Sunday, October 18 through Sunday, November 1, 2026, between 9 p.m. and 5 a.m. Active workdays are Sunday through Thursday. Crews will be resurfacing the intersection. Motorists can expect slow-moving traffic and should use caution as crews work on and near the roadway.