- Road closures will begin at approximately 4 p.m. and will affect portions of North and South Ridgewood Drive (S.R. 17), Circle Park Drive, North and South Mango Street, Lemon Avenue, East and West Center Avenue, North and South Commerce Avenue, North Wall Street, North Pine Street, and nearby alleys.
- All listed road closures are expected to reopen by approximately 10 p.m.
- Northbound S.R. 17 traffic will be detoured using Franklin Street, Park Street, and North Pine Street before returning to North Ridgewood Drive.
- Southbound S.R. 17 traffic will be detoured using North Pine Street, Park Street, and Lakeview Drive before returning to South Ridgewood Drive.
- Motorists should expect delays, use caution, and follow all posted detour signs and traffic-control directions while traveling through downtown Sebring.
Bayview Street from Lakeview Drive to U.S. 27 in Highlands County: Road work project: Beginning Monday, November 9, 2026, Highlands County Traffic Operations will close westbound Bayview Street daily while Highlands County Road & Bridge crews perform roadway work. The project is expected to last approximately two weeks.
- Westbound Bayview Street will be closed daily from 8 a.m. to approximately 4:30 p.m. Eastbound Bayview Street will remain open.
- Detours will be available via Sandra Boulevard to Sebring Parkway or Vicki Drive to U.S. 27. Westbound traffic is expected to reopen each day at approximately 4:30 p.m.
- Staff will be stationed near the Lakeview Drive end of the closure to help direct motorists toward available detours.
- Motorists should use caution, allow additional travel time, and follow posted detour signs and traffic-control directions.
- Estimated completion: Approximately two weeks from November 9, 2026.
S.R. 25 (U.S. 27) South of Hammock Road: Permit construction project: Permit-related construction activities will take place along U.S. 27 south of Hammock Road.
- Periodic lane closures may occur as trucks enter and exit the work site. Motorists should use caution, reduce speed, and watch for workers and equipment in the construction zone.
The project is expected to last approximately six months.