- Tentative nighttime operations are anticipated during the first week of November.
- Motorists should use caution, remain alert, and watch for workers and equipment throughout the construction zone.
Estimated completion is in summer 2027.
HIGHLANDS COUNTY
S.R. 25 (U.S. 27) from Shoreline Drive to Davis and Gaines Road and from North of Tower Street to South of Tower Street: Construction project: Crews are reconstructing rigid pavement on S.R. 25 (U.S. 27) from north of Tower Street to south of Tower Street. Additionally, milling and resurfacing work is ongoing on U.S. 27 from Shoreline Drive to Davis and Gaines Road.
- Daily daytime and nighttime lane closures continue on northbound and southbound S.R. 25 (U.S. 27) for paving, lighting, signalization, signage, curb, sidewalk, and other roadway activities throughout the project limits.
- Nighttime curb, gutter, sidewalk, crosswalk, and drainage-flume work is scheduled through mid-November.
- Daytime and nighttime paving activities are scheduled to continue through mid-November at various locations.
- Intermittent lane closures may occur at the U.S. 27 and Dal Hall Boulevard/Tower Street intersection while crews complete roadway work. Motorists should use extra caution in this area.
- Daytime lighting, signalization, and signage activities will continue throughout the project limits.
- Motorists should use caution at the U.S. 27 and Dal Hall Boulevard/Tower Street intersection due to construction traffic entering and leaving the work zone.
- The northbound U.S. 27 lane shift moving traffic onto the newly constructed concrete pavement at the U.S. 27 and Dal Hall Boulevard/Tower Street intersection has been completed. Drivers should use extra caution while traveling through this area.
- Motorists should remain alert for daytime and nighttime lane closures, workers, equipment, and changing traffic patterns throughout the construction zone.