Estimated completion: November 23, 2026.
U.S. 27 (SR 25), Railroad Crossing East of Palmdale Sand Mine and Northwest of Moore Haven: Motorists should expect increased train activity beginning in October for the 2026 harvest season. FDOT and South-Central Florida Express remind drivers to allow extra travel time, remain alert and obey all railroad crossing signs, signals and gates. Never drive around lowered gates or enter the crossing unless there is enough room for the entire vehicle to clear the tracks. Wait until gates are fully raised, warning lights stop flashing and tracks are clear before proceeding.
U.S. 17 northbound between Fish Branch Road and Bronco Road: Maintenance project: Crews will perform ditch-cleaning operations within the right of way from Monday, November 2, through Thursday, November 5, 2026.
S.R. 29 (Bridge Street) LaBelle Drawbridge over the Caloosahatchee River: The Florida Department of Transportation (FDOT) continues to monitor the LaBelle Drawbridge in Hendry County following extensive structural repairs and load testing.