Refer to discussion in Section 5.4.13 and the Pond Siting Report on file.
Water Quality Treatment: The alternative SMFs have been evaluated to provide treatment for the entire project limit in accordance with the following State standards based on the ERP Applicant's Handbook Volume I. For the impaired basins, BMP Trains was used to show a total of 80% nitrogen and 80% phosphorus removal for proposed project due to the impairment of waterbodies. A higher rate of nutrient removal of 95% on nitrogen and phosphorus will be evaluated for the Interim Improvements condition in the future phase to accommodate the encroachment of OFW's boundaries at the watershed downstream end.
Water Quantity: SWFWMD has water quantity criteria for open basins that must be satisfied.
The project’s drainage design is to provide floodplain compensation in compliance with FEMA, SWFWMD, and FDOT guidelines. No net encroachment shall occur as a result of the proposed activity.
All floodplain within the right-of-way is assumed to be completely impacted. This includes both existing right-of-way as well as areas where additional right-of-way has been proposed for roadway or use as stormwater management facilities.
The following floodplain information for the project area was reviewed:
The project traverses through two FEMA floodplains, including Zone AE on land and Zone VE over the Manatee River (North American Vertical Datum 88 (NAVD88)). The DeSoto Bridge is located over the Zone VE, but this should not impact the project. Roadway widening may impact the floodplain, and compensation will be accounted for in the pond design. Floodplain compensation