The Preferred Alternative is the Build Alternative, including its first phase of implementation, referred to as the Interim Improvements. The Preferred Alternative meets the project's purpose and needs by providing additional capacity for north-south traffic and improving safety for travelers using the corridor.
Conceptual design plans for the Preferred Alternative are included in Appendix C.
Page | 63