• Navigational requirements – 40-foot vertical clearance; 75-foot horizontal clearance
  • Design high water, including impacts from projections – 1.6 feet
  • Design wave heights for coastal bridges – To be determined during Design Phase Design Criteria

Design criteria for the proposed improvements are based on the FDOT Design Manual, effective January 2026. A summary of the design criteria used to evaluate existing conditions and develop proposed improvements is listed in Table 4-1 on the following pages.

Table 4-1 – Design Criteria

Design ElementDescription2026 FDM (or Other)
General
Functional ClassificationUrban Principal Arterial Other(Straight Line Diagram 3/24)
Context ClassificationC3C – Suburban Commercial\n- From US 301 at 9th St to Railroad (RR) Crossing #624712-B\n- From 1st St East to south of 17th St East\nC4 – Urban General\n- From RR#624712-B to 1st St East\nC3R – Suburban Residential\n- From south of 17th St East to north of 25th Street East(ETDM Project #14507)
Design Speed40 mph - 45 mph (30 mph for ramps)Table 201.5.1, 201.5.2
Design VehicleWB-62FLSection 201.6
Typical Section
General-useAuxiliaryRamps
Travel Lane Width11 ft11 ft15 ftTable 210.2.1, 211.2.1
Shoulder Width – Median – Outside10 ft 10 ft8 ft 10 ft4 ft 4 ftTable 210.4.1, 211.4.1
Median Width – Left Turn Lane + Elev Lanes32.5 ft----Table 215.2.2
– No Left Turn Lane + Elev Lanes22 ft----Table 210.3.1
Border Width14 ft14 ft12 ftTable 210.7.1
Clear Zone24 ft14 ft14 ftTable 215.2.1
Lateral Offset to Bridge Pier16 ft4-6 ft4-6 ftTable 215.2.2
Cross Slope (inside to out)2% - 3%2%2%Figure 210.2.1
Horizontal
Deflection Without Curve (Max)1 degree----Section 210.8.1
Curve Length (Min)400-675 ft400-675 ft400-450 ftTable 210.8.1
Curve Radius (Min)559 ft559 ft231 ftTable 210.8.2
SE Transition Rate (e max = 0.10)1:200 – 1:1601:2001:175Table 210.9.3
SE Transition Length (Min)100 ft100 ft100 ftSection 210.9
Taper Rate (Min)L = W × SL = W × SL= (W × S2)/60Section 210.2.5
Vertical
Max Grade (Flat Terrain)6%6%8%Table 210.10.1

Page | 45