low R-squared value. When comparing the three different analyses, the Linear Regression analysis provided the highest R-square values with an average growth rate of 0.60%.
Table 3-2 – Growth Trends
SegmentType of AnalysisAnnual Growth Rate (%)R-Squared (%)
Site: 135023\nRoadway: US 41/1st Street\nDescription: SR 55/US 41/301, north of 13th Avenue ELinear0.67%11.37%
Exponential0.65%10.68%
Decaying Exponential0.67%10.65%
Site: 135022\nRoadway: US 41/1st Street\nDescription: SR 55/US 41/301, south of westbound SR 64/Manatee Avenue WBLinear-0.25%0.86%
Exponential-0.15%0.29%
Decaying Exponential0.51%2.97%
Site: 130031\nRoadway: US 41/1st Street\nDescription: SR 55/US 41/301/1st Street, north of Manatee RiverLinear0.33%9.10%
Exponential0.34%9.56%
Decaying Exponential0.49%17.63%
Site: 135026\nRoadway: US 41/1st Street\nDescription: SR 55/US 41, north of SR43/US 301Linear1.07%24.35%
Exponential1.01%22.71%
Decaying Exponential0.81%13.18%
Site: 135081\nRoadway: US 41\nDescription: SR 55/US 41, north of 25th Street ELinear1.80%44.87%
Exponential1.66%42.15%
Decaying Exponential1.70%38.89%
Site: 135091\nRoadway: US 41\nDescription: SR 55/US 41 SB, north of 17th Avenue WLinear-0.01%0.02%
Exponential-0.01%0.01%
Decaying Exponential0.11%0.67%
Under a No-Build scenario, in 2045, the LOS is projected to remain at F as conditions will only be exacerbated by increased traffic volumes. Traffic volumes on the DeSoto Bridge are anticipated to increase by about 27.69% by 2045.
Page | 43