___

south east of 1st St E before ending at the northeast corner of the 3rd Ave W and 1st St E intersection.

10 Manatee County Traffic Operations No Facilities No

11 MCI Metro Access Transmission Services, LLC MCI has 2 x 2" HDPE conduit with FOC just south of 3rd Ave W that runs north along the west side of US 41, where it goes subaqueous to cross along the west side of the bridge, eventually exiting the project limits to the north. MCI has 2 x 2" HDPE conduit with FOC just south of 3rd Ave W that runs north along the east side of US 41 where it goes subaqueous to cross along the east side of the bridge eventually exiting the project limits to the north. No (Unless UAO proves facilities were installed 7 or less years ago)

12 Peace River Electric Cooperative, Inc. No Facilities No

13 Peoples Gas System, Inc. TECO Peoples Gas has an 8" gas main just south of the southern point of the bridge that runs north along the east side of the bridge, eventually ending just north of the bridge. No (No Easement Provided)

14 Spectrum Sunshine State, LLC Spectrum has multiple crossings at the southern end of the project. Spectrum has underground facilities at the northeast corner of Manatee Ave and US 41 intersection that cross to the northwest corner and continue north, going subaqueous at the bridge and crossing to the east side of US 41 just north of the bridge on the east side of US 41 running north until exiting the project. No (Unless UAO proves facilities were installed 7 or less years ago)

15 Unitii Fiber LLC (Windstream) Unitii has underground facilities north of Haben Blvd running south along the west side of US 41, attaching to the bridge to continue south along the west side. No (Unless UAO proves facilities were installed 7 or less years ago)

16 Zayo Group LLC Zayo has a buried fiber line at the southwest corner of the Manatee Ave and US 41 intersection that runs north before going subaqueous and crossing to the north end of the bridge. Zayo has a buried fiber line just north of the bridge that runs north along the west side of US 41 to the southwest corner of the Haben Blvd and US 41 intersection. Zayo has a buried fiber line at the southwest corner of the Haben Blvd and US 41 intersection that crosses to the southeast corner and then runs north, exiting the project limits No (Unless UAO proves facilities were installed 7 or less years ago)

Railroads within the Study Area:

There is one exiting CSX at-grade railroad crossing, RR#624712-B, located north of 17th Ave West. [DA4] [AY5] [CF6] The Preferred Alternative will construct a two-lane viaduct that will span the railroad with a minimum vertical clearance of 23 feet. No piers will be

Page | 32