The following technical reports, documents, engineering, and environmental studies and analyses were conducted as part of the PD&E Study phase:
Public Involvement Documents:
Public Involvement Plan (PIP) (June 2026) – Draft
Advance Notification Package (January 2026)
Public Hearing Transcript – TBD
Comments and Coordination Report - TBD
Contamination Screening Evaluation Report (CSER) (June 2026) - Draft
Cultural Resource Assessment Survey (CRAS) (June 2026) - Draft
Natural Resources Evaluation (NRE) (June 2026)- Draft
Noise Study Report (NSR) (June 2026)- Draft
Conceptual Stage Relocation Plan (June 2026) - Draft
Section 4(f) Applicability Determination
Water Quality Impact Evaluation (WQIE) (June 2026)- Draft
Type 2 Categorical Exclusion (Type 2 CE)
ETDM Programming Summary Report (April 2026)
Location Hydraulic Report (LHR) (April 2026) - Draft
Sea-Level Impact Projection (SLIP) Study (March 2026) – Draft
Pond Siting Report (PSR) (June 2026) - Draft
Project Traffic Analysis Report (PTAR) (June 2026)
Typical Section Package (June 2026) - Draft
Utility Assessment Package (UAP) (June 2026) - Draft