Skip Stripe No. of Stripes
| Skip Stripe No. or Stripes | |||||
| Pay Items | |||||
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount | |
|---|---|---|---|---|---|
| 706-1-3 | RAISED PAVMT MARK, TYPE B PAINTED PAVT MARK,STD,WHITE,SOLID,6" | 332.00 EA | $4.63 | $1,537.16 | |
| 710-11-101 | PAINTED PAVT MARK,STD,WHITE,SOLID,6" | 1.97 GM | $1,679.75 | $3,309.11 | |
| 710-11-131 | PAINTED PAVT MARK,STD,WHITE,SKIP, 6" | 1.97 GM | $580.41 | $1,143.41 | |
| 711-16-101 | THERMOPLASTIC, STD-OTH, WHITE, SOLID, 6" | 1.97 GM | $5,929.85 | $11,681.80 | |
| 711-16-131 | THERMOPLASTIC, STD-OTH, WHITE, SKIP, 6" | 1.97 GM | $1,486.23 | $2,927.87 | |
| Peripherals Subcomponent | |||||
| Description | Value | ||||
| Off Road Bike Path(s) | 0 | ||||
| Off Road Bike Path Width L/R | 12.00 / 12.00 | ||||
| Bike Path Structural Spread Rate | 220 | ||||
| Noise Barrier Wall Length | 0.00 | ||||
| Noise Barrier Wall Begin Height | 0.00 | ||||
| Noise Barrier Wall End Height | 0.00 | ||||
| Pay Items | |||||
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount | |
| 160-4 | TYPE B STABILIZATION | 8,088.49 SY | $5.52 | $44,648.46 | |
| 285-701 | OPTIONAL BASE,BASE GROUP 01 | 6,932.99 SY | $22.85 | $158,418.82 | |
| 334-1-13 | SUPERPAVE ASPHALTIC CONC, TRAFFIC C Roadway Component Total | 762.63 TN | $178.48 | $136,114.20 | |
| $2,011,801.12 | |||||
| SHOULDER COMPONENT | |||||
| User Input Data | |||||
| Description | Value | ||||
| Total Outside Shoulder Width L/R | 6.75 / 8.75 | ||||
| Total Outside Shoulder Perf. Turf Width L/R | 4.50 / 6.50 | ||||
| Sidewalk Width L/R | 0.00 / 0.00 | ||||
| Pay Items | |||||
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount | |
| 520-1-10 | CONCRETE CURB & GUTTER, TYPE F | 2,599.87 LF | $33.61 | $87,381.63 | |
| 520-1-10 | CONCRETE CURB & GUTTER, TYPE F | 2,599.87 LF | $33.61 | $87,381.63 | |
| 570-1-1 | PERFORMANCE TURF | 3,177.62 SY | $9.03 | $28,693.91 | |
| X-Items | |||||
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount | |
| 160-4 | TYPE B STABILIZATION | 1,335.00 SY | $5.52 | $7,369.20 | |
| 285-704 | OPTIONAL BASE,BASE GROUP 04 | 1,335.00 SY | $19.17 | $25,591.95 | |
| 334-1-13 | SUPERPAVE ASPHALTIC CONC, TRAFFIC C CONCRETE CURB & GUTTER, TYPE E | 1,100.00 TN | $178.48 | $196,328.00 | |
| 520-1-7 | CONCRETE CURB & GUTTER, TYPE F | 5,371.00 LF | $30.75 | $165,158.25 | |
| 520-1-10 | CONCRETE CURB & GUTTER, TYPE F | 5,200.00 LF | $33.61 | $174,772.00 | |
| Erosion Control | |||||
| Pay Items | |||||
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount | |
| 104-10-3 | SEDIMENT BARRIER | 5,199.74 LF | $2.28 | $11,855.41 | |
4