Table 1-5 – Crash Statistics

Crash Statistics
FacilityLimitsTotal 5-Year CrashesFatal CrashesSerious Injury CrashesPredominant Crash Type (% of Crashes)
US 41 Business (SR 45) Green BridgeWestbound SR 64 to 10th Street485211Rear End (26%); Sideswipe (24%)
US 41 (SR 55) / US 301 (SR 683) DeSoto BridgeWestbound SR 64 to 10th Street80318Rear End (47%)
I-75 (SR 93) I-75 BridgeWestbound SR 64 to US 3011,119545Rear End (47%)
Source: Signal 4, 2020-2024.

The five-year crash rates for all three facilities exceed both the FDOT District One and statewide average cash rates for similar facilities, as shown in Table 1-6.

Table 1-6 – Crash Rates

Crash Statistics
FacilityLimits5-Year Crash Rates(1)District One Average Crash Rates(2)Statewide Average Crash Rates(3)
US 41 Business (SR 45) Green BridgeWestbound SR 64 to 10th Street3.871.271.03
US 41 (SR 55) / US 301 (SR 683) DeSoto BridgeWestbound SR 64 to 10th Street3.811.271.03
I-75 (SR 93) I-75 BridgeWestbound SR 64 to US 3011.330.690.90
Sources/Notes:(1) Crashes per Million Vehicle Miles Traveled - calculated using 2020-2024 five-year crash totals and AADT volumes.(2) Average Number of Crashes per MVMT on Similar FDOT District One Facilities.(3) Average Number of Crashes per MVMT on Similar Statowide Facilities

(3) Average Number of Crashes per MVMT on Similar Statewide Facilities.

Project Status

The project is identified in the Sarasota/Manatee MPO 2050 LRTP as a Tier 2 Roadway Capacity Program Project (unfunded). While it is noted in the Sarasota/Manatee MPO Fiscal Years (FY) 2025/26 - 2029/30 Transportation Improvement Program (TIP) as a regional bridge priority and part of the 2024 List of Project Priorities, no funding is identified. It is additionally identified as part of the Sarasota/Manatee MPO 2025 List of Project Priorities. The project is also included in the current FDOT State Transportation Improvement Program (STIP) as well as the FDOT 2026 - 2030 Five-Year Work Program with funding allocated for the PD&E phase in FY 2026. As the project advances, FDOT District One will coordinate with the Sarasota/Manatee MPO to ensure