POLE CABLE DIST SYS, CONVENTIONAL Subcomponent Total 158.00 EA $929.33 $3,118,594.51 $146,834.14
715-500-1
Lighting Component Total $3,118,594.51
BRIDGES COMPONENT
| Bridge 130053 | |
| Description | Value |
|---|---|
| Estimate Type | SF Estimate |
| Primary Estimate | YES |
| Length (LF) | 2,200.00 |
| Width (LF) | 46.00 |
| Type | Low Level |
| Cost Factor | 2.48 |
| Structure No. | |
| Removal of Existing Structures area | 0.00 |
| Default Cost per SF | $164.00 |
| Factored Cost per SF | $406.72 |
| Final Cost per SF | $407.96 |
| Basic Bridge Cost | $41,160,064.00 |
| Description | |
Bridge Pay Items
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount |
|---|---|---|---|---|
| 400-2-10 | CONC CLASS II, APPROACH SLABS | 102.22 CY | $1,008.98 | $103,137.94 |
| 415-1-9 | REINF STEEL- APPROACH SLABS | 17,888.50 LB | $1.25 | $22,360.62 |
Bridge 130053 Total $41,285,562.56
Bridge 130002
| Description | Value |
|---|---|
| Estimate Type | SF Estimate |
| Primary Estimate | YES |
| Length (LF) | 200.00 |
| Width (LF) | 156.00 |
| Type | Low Level |
| Cost Factor | 2.41 |
| Structure No. | |
| Removal of Existing Structures area | 16,000.00 |
| Default Cost per SF | $164.00 |
| Factored Cost per SF | $395.24 |
| Final Cost per SF | $408.88 |
| Basic Bridge Cost | $12,331,488.00 |
| Description |
Bridge Pay Items
| Pay item | Description | Quantity Unit | Unit Price | Extended Amount |
|---|---|---|---|---|
| 110-3 | REMOVAL OF EXISTING STRUCTURES/BRIDGES | 16,000.00 SF | $91.62 | $1,465,920.00 |
| 400-2-10 | CONC CLASS II, APPROACH SLABS | 346.67 CY | $1,008.98 | $349,783.10 |
| 415-1-9 | REINF STEEL- APPROACH SLABS | 60,667.25 LB | $1.25 | $75,834.06 |